Laserfiche WebLink
Qbhf!235!pg!2:4 <br />2024 CIP2024 CIP <br />11,753 <br />$ $ <br />$ 2024 CIP$ 2024 CIP <br />y <br />10,00010,000 <br />Attachment 1: Over $10,000 Items for Purchase or Sale/Trade-in 131,000 <br />BudgetP.O.Budget / <br />AmountAmountCIP <br />Trade-In <br />Est. Sale / <br />$ $ 36,575$ 35,246 <br />$ 14,660$ <br />y <br />(c) <br />Skid Steer Snow Blower(b) <br />. <br />DivisionDescriptionAmount <br />rovement CIP <br />p <br />RTL EquipmentFire Department2010 Fire Engine135,000 <br />Headwaters PaintingSand, Wash and Paint Apparatus Bay Doors(a)20,000 <br />Erickson Electric CompanyVariable Frequency Drive <br />This is planned maintenance and painting of the apparatus doors at the fire station, which has been inlcuded in the 2024 CIP. The apparatus doors are showing normal wear and tear and <br /> staff is recommending this maintenance.This is a planned purchase and replacement of the 2005 skid steer snow blower that is in operation and has been included in the 2024 CIP budget. <br /> The typical replacement cycle is 15 years, indicating that the current blower attachment is at the end of its useful life. It is planned to sell the 2005 model to cover the difference <br /> of the purchase price of the new model from RTL Equipment. This purchase would be made off of Minnesota State Contract T-632(5).The Walsh Storm Water lift station was replaced in 2017. <br /> At the time of the replacement a Variable Frequency Drive (VFD) was considered but was not added. After 8 years of operating the new pumps, staff is recommending a VFD be added to better <br /> control the pumping and to reduce intake maintenance. The VFD will allow the city to pump the pond more slowly or faster depending on the need. This will help control flooding better <br /> and reduce intake maintenance when the pump is operated slower as it should reduce the suction which creates a lot of intake maintenance from debris being pulled into the wet well. <br /> There is $131,000 in unspent funds in the Storm Drainage Other Improvements CIP. Staff is requesting using some of these funds to add the VFD.It was planned that the Arboretum Fountain <br /> to have a full replacement in the 2024 Parks Improvement CIP. With onl$10,000 budgeted in the 2024 CIP for the demolition of the old fountain and installation of the new fountain, the <br /> remaining $25,246 will be covered by donations that have been received by the arboretum and the fund balance within the Parks Im <br />(a)(c) <br />(b)(d) <br />Key <br />t <br />DivisionVendorDescriptionKe <br />Public Works <br />Fire Departmen <br />Parks & RecreationVilla LandscapesArboretum Fountain(d) <br />Public Works (Storm Drainage) <br />General Purchases or Contracts <br />Sale of Surplus Vehicles or Equipment <br /> <br />