My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09232024
Roseville
>
City Council
>
City Council Meeting Packets
>
2024
>
CCP 09232024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 3:54:23 PM
Creation date
9/27/2024 3:54:04 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/23/2024
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 13, 2024 <br />Mr. Erik Henricksen <br />Assistant CityEngineer <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />Re:Bid Results <br />Dale-Owasso Lift Station Improvements <br />BMI Project No. 0M2.133253 <br />Dear Mr.Henricksen: <br />Three(3)bids were submitted for the Dale-Owasso Lift Station Improvements project on September 12, <br />2024. This project used the Best Value Contracting process for assurance of contractor quality. The Best <br />Value Contractingproposals were evaluated prior to the bid opening and the technical scoresfromthe <br />evaluators wereaveraged for each proposer. <br />The bidsfor the projectranged from $535,715.00 to $624,603.00.cost opinionfor this <br />project was $630,000.00.The bid prices were divided by the Average Evaluation Scoresto determine the <br />adjusted bid prices. The following table lists the bidders, bid prices, average evaluation scores, and the <br />adjusted prices: <br />Average Evaluation Adjusted Bid Price (Bid <br />ContractorBid Price <br />ScorePrice/Avg. Eval. Score) <br />Minger Construction <br />$619,000.00100.00$619,000.00 <br />Company <br />Meyer Contracting, Inc.$624,603.0098.75$632,509.37 <br />Pember Companies Inc.$535,715.0095.00$563,910.53 <br />Based on the summary above, if the citywishes to award the project to the lowest adjusted price <br />bidder, then Pember Companies,Inc.should be awarded the project forthe Total Base Bid Amount of <br />$535,715.00. <br />Sincerely, <br />Bolton & Menk, Inc. <br />JacobE.Humburg, P.E. <br />Principal Environmental Engineer <br />(Ȁ͐2/3%͐Ώ-ΑΐΒΒΑΔΒ͐ΐ͑#®±±¤²͐#͑4® /³§¤±²͐ΑΏΑΓȃΏΘȃΐΒ "¨£ %µ «´ ³¨® ,¤³³¤± $ «¤ȃ/¶ ²²®ȁ£®¢· <br />Qbhf!338!pg!345 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.