My WebLink
|
Help
|
About
|
Sign Out
Home
2024-11-7_PR_Comm_Min
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Minutes
>
2024
>
2024-11-7_PR_Comm_Min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 3:59:20 PM
Creation date
12/4/2024 3:59:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planned expected life <br /> Actual condition <br />o Parks and Recreation System Master Plan <br />o Significant demand <br />o Opportunity/leveraging of resources <br />o Equity analysis <br /> Parks and Facilities Projects – 2024 Review <br />o Large Parks/Facilities Projects <br /> Sunset Park <br /> Accelerated Emerald Ash Borer <br />o Smaller Parks/Facilities Projects <br />Frank Rog Amphitheater upgrades (Friends funded) <br />Muriel Sahlin Arboretum fountain (partially donor funded) <br />Pathway replacement at Acorn Park <br /> Harriet Alexander Nature Center cairns (Friends/Donor funded) <br />o Roseville Skating Center <br /> LED lighting conversion <br /> OVAL lobby painting <br /> Rubber flooring upgrades <br /> Window coverings <br />Exterior painting <br />Skate Park equipment additions <br /> 2025 Planned Projects – Parks <br />o Lexington Park (partially Friends funded) <br /> Spring/summer install <br />o Rosebrook Park Site Plan <br /> Under consideration for 2025 <br />o Mid-Size projects currently planned/under consideration for 2025 <br /> Central Park Victoria tennis courts <br /> Concordia Park fencing <br /> Harriet Alexander Nature Center signage (donor funded) <br /> Rosebrook Park field work <br /> General amenity replacement <br /> Pathway wayfinding signage <br /> 2025 Planned Projects – Roseville Skating Center <br />o OVAL Scoreboard (user supported/donor funding) <br />o City Hall message sign <br />o Dehumidification system (arena) <br />o Updates to the arena sound system (user supported) <br />o HVAC updates <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.