Laserfiche WebLink
<br />measure frequency of carts with observable contaminants as collected. For example, on-board <br />cameras may be used to record an image or video of the contents of the cart as it is tipped into <br />the truck hopper. The Contractor shall submit a proposed alternative means of contaminant and <br />participation measurement for approval by the City. <br /> <br />2.5.2 Multi-Dwelling Units Collection <br />Contractor shall empty all acceptable materials from inside the containers and a reasonable <br />amount of acceptable, overflow recyclable materials that may be set adjacent to the containers. <br />The Contractor shall contact the MDU owner that continued overflow recyclables will <br />necessitate increased service levels (e.g., more containers, more frequent collections, and/or <br />larger containers). After emptying the containers, the Contractor shall return the containers to <br />their appropriate locations. <br /> <br />MDUs shall receive service once a week, unless a two times per week frequency is agreed to by <br />the City, the property owner, and the Contractor. The City does not regulate the day of the week <br />MDUs shall receive service. Contractor shall inform the City and each dwelling owner or <br />manager the day and approximate time the dwelling is scheduled to receive service. <br /> <br />2.5.3 City Facilities <br />Contractor will provide weekly recycling service at no additional charge to: <br /> <br />1.!Cedarholm Community Building 2395 Hamline Avenue <br />2.!City Hall 2660 Civic Center Drive <br />3.!Harriet Alexander Nature Center/Wildlife Rehabilitation Center 2520 Dale Street <br />4.!Lexington Shops 2719 Lexington Avenue <br />5.!Roseville Fire Station 2701 Lexington Avenue <br />6.!Roseville Maintenance Facility 1140 Woodhill Drive <br />7.!Roseville Skating Center 2661 Civic Center Drive <br />8.!Other mutually agreed upon City facilities <br /> <br />2.5.4 City Parks <br />The Contractor shall use a smaller vehicle appropriate for driving on City Parks trails. The <br />Contractor shall comply with the Roseville Parks Safety Plan <br />(http://www.cityofroseville.com/436/Recycling). Contractor shall submit its operating plan, <br />including vehicles, for City review and approval. <br /> <br />The Contractor should also provide a recommended schedule for servicing the parks and include <br />a removal and placement plan of carts in the spring and fall. Actual schedules will vary <br />depending on weather. The Recycling Coordinator will inform the Contractor on scheduling the <br />servicing, dates for removal, and placement of the carts. <br /> <br />Exhibit D, City Buildings and Parks Recycling, contains the maps and list of parks and number <br />of carts that will need servicing either weekly or every other week. <br /> RFP for City of Roseville Recycling Services A-9 <br /> RS160\\1\\934842.v1 <br />Qbhf!221!pg!6:7 <br /> <br />