Laserfiche WebLink
<br />decide said question within 60 days following Contract by the arbitrators to serve on the panel. <br />The arbitration panel shall operate in accordance with the Rules of the American Arbitration <br />Association to the extent consistent with this section, and judgment upon the award by the <br />Arbitrator(s) may be entered in any court with jurisdiction thereof. Meanwhile, collection of said <br />recyclable material shall continue, pending outcome of arbitration. <br /> <br />4.3!Estimating Materials Composition as Collected <br />recyclables <br />each year to estimate the relative amount by weight of each recyclable commodity by grade. The <br />analysis shall include: <br /> <br />1.!Percent by weight of each recyclable commodity by grade as collected from the City. <br />2.!R. <br />3.!Description of the methodology used to calculate the composition, including number of <br />samples, dates weighed, and City route(s) used for sampling. The Contractor shall <br />provide the City with a copy of each analysis. The analysis will be conducted no later <br />than March 31 of each year, and a copy of the analysis will be provided to the City no <br />later than April 30 of each year. Upon request of the City, an agent(s) of the City shall <br />attend the composition study. <br />4.4!Estimating Process Residuals <br />The Contractor shall provide the City a written description of the means to estimate process <br />residuals, as defined in Section 1, Definitions , <br />recyclables. This written description shall be reviewed and approved in writing by the City. This <br />written description shall be updated by the Contractor immediately after any significant changes <br />to the processing facilities used by the Contractor. <br /> <br />4.5!Performance Monitoring <br />The City will monitor the performance of the Contractor against goals and performance <br />standards required within this RFP and in the Contract. Substandard performance as determined <br />by the City will constitute non-compliance. If action to correct such substandard performance is <br />not taken by the Contractor within 60 days after being notified by the City, the City will initiate <br />the Contract termination procedures. <br /> <br />The City shall have the right, during the term of the Contract, to have a representative on <br /> <br /> <br />4.6!End Market Certification <br />The Contractor shall provide by January 31 of each year through the term of the Contract written <br />certification to the City that all recyclable commodities identified are indeed recycled and not <br /> RFP for City of Roseville Recycling Services A-21 <br /> RS160\\1\\934842.v1 <br />Qbhf!233!pg!6:7 <br /> <br />