My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 11042024
Roseville
>
City Council
>
City Council Meeting Packets
>
2024
>
CCP 11042024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 12:14:34 PM
Creation date
1/13/2025 12:14:15 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
11/4/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />REQUEST FOR COUNCIL ACTION <br />Date: 11/4/2024 <br />Item No.: 7.c. <br />Department Approval City Manager Approval <br /> <br />Item Description: Review the 2025 Proposed Utility Rates <br />1 <br />2 Background <br />3 Unlike many city services that are supported by property taxes, our utility or enterprise operations are <br />4 funded primarily by user fees and are operated as separate, stand-alone functions. The City engaged <br />5 Ehlers to perform an update to the utility rate study of the Water, Sanitary Sewer and Storm Drainage <br />6 Funds from 2022, attachment 2 contains the study. Ehlers staff presented their analysis at the October <br />7 7 City Council meeting and the October 8 Finance Commission meeting. Over the past few years, city <br />8 staff have curtailed capital improvements to allow for water and storm drainage funds to build their <br />9 minimum fund reserves. Attachment 3 is a memo from the Public Works Director outlining changes <br />10 made to the capital improvements to the Water, Sanitary Sewer and Storm Drainage funds. <br />11 <br />12 Water Fund Operations <br />13 The updated Utility Rate Study done by Ehlers on the Water Fund recommends a 5.5% increase in rates <br />14 for 2025 to cover fixed and variable costs, debt service and replenishment of fund reserves. The <br />15 previous study recommended an 8% increase in rates for 2025. As a result of curtailment of capital <br />16 improvements, this fund is starting to recover and build reserves. One of the main costs is the purchase <br />17 of water from St. Paul Regional Water. Their increases for 2025 are roughly 8% and then drop to a 5% <br />18 increase in 2026. In addition, this fund is still working on building fund reserves to cover the minimum <br />19 for operations and the amount needed for capital. The study anticipates hitting these reserve levels in <br />20 2030. <br />21 <br />22 Storm Drainage Operations <br />23 The City provides for the management of storm water drainage to prevent flooding and pollution control, <br />24 as well as the street sweeping program. In 2022, the Utility Rate Study done by Ehlers recommended a <br />25 33% increase for 2023-2024 to cover fixed and variable costs of the Storm Drainage fund and a 2.5% <br />26 increase thereafter. Through the increases in 2023 and 2024 and the curtailment of capital <br />27 improvements made by Public Works, the fund is now on course to be able to cover operations and <br />28 capital infrastructure needs for the next five years. The current update of the utility rate study <br />29 recommends a 0% increase. <br />30 <br />31 Sanitary Sewer Operations <br />32 The City maintains a sanitary sewer collection system to ensure the public’s health and general <br />33 welfare. The previous study recommended a 2% increase to mainly cover the cost increases of <br />34 Metropolitan Council Environmental Services. The current update of the utility rate study recommends a <br />35 0% increase. Public Works has included an updated lift station study in the 2025 budget. It is <br />36 anticipated that this study will impact future capital improvement project costs and needs. <br />37 <br />38 Recycling Operations <br />39 The recycling operation provides for the contracted curbside recycling pickup throughout the City and <br />40 related administrative costs. The primary operating cost is the amounts paid to a contractor to pick up <br />41 recycling materials. In 2024, the City solicited bids on the recycling operations and on October 7, 2024, <br />Page 1 of 3 <br />Qbhf!55!pg!297 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.