Laserfiche WebLink
2025 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Public Works <br />Project/Initiative Title: Eng. GPS System <br />Total Estimated Cost: $30,000 <br />Funding Source: Public Works Vehicle & Equip Fund (property tax) <br />Annual Operating Budget Impact: $0 <br />Project/Initiative Description: <br />Replacement of existing GPS equipment. This equipment is used for surveyor construction project <br />and other city survey needs. The existing equipment is from 2010. The replacement cycle is <br />typically 12 years. The new equipment is the latest technology and will replace equipment that is <br />past its useful life. <br /> <br /> <br /> <br />Location: <br />Engineering – Survey Vehicle <br /> <br />25 <br />Qbhf!96!pg!527 <br /> <br />