Laserfiche WebLink
2025 Capital Improvement Plan <br /> Project/Initiative Summary <br /> <br />Department/Division: Parks and Recreation Skating Center- Indoor Arena <br />Project/Initiative Title: Replacement of 2013 Ice Resurfacer <br />Total Estimated Cost: $ 150,513.20 <br />Funding Source: General Facilities Replacement Fund 410 <br />Annual Operating Budget Impact: \[NA\] <br />Project/Initiative Description: <br />This is for the replacement of the indoor arena 2013 Zamboni Ice Resurfacer Model 552. A useful <br />life of about 10 years is industry standard in this type of setting.It is utilized to resurface the ice <br />numerous times a day, is experiencing significant issues and is nearing the end of its useful life. A <br />475 day lead time for ordering is needed. The proposed replacement is for a 2024 Zamboni Ice <br />Resurfacer Model 552. <br /> <br />In the past 3 years we have needed to replace several items as wear and tear is inevitable. The list <br />includes but is not limited to the following: <br />-Check Valves <br />-Snow Breaker <br />-Impeller <br />-Ball Joints <br />-Batteries <br />-Pump Motor <br />-Hydraulic Motor <br />-Horizontal Auger <br /> <br /> <br />Location: <br />The ice resurfacer (Zamboni) is stored in the Skating Center – Indoor Ice Arena <br /> <br />29 <br />Qbhf!9:!pg!527 <br /> <br />