My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 03172025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 03172025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:10:39 PM
Creation date
3/14/2025 3:09:49 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
3/17/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The new office space is awesome! We have a comfortable, modern space now available <br />“ <br />for our Veterans and their families to sit down and not feel cramped into a small office <br />setting. We’ve had many positive comments about how welcoming and comfortable the <br />office and facility at-large is from our customers. The plan and layout is exactly what we <br />asked for and the finishes are well done and fit our business needs. The employees are <br />happier and that leads to better customer satisfaction. <br />GREG PICKARD <br />The BKV Group got to know us as their client very well, they listened well and sought <br />“ <br />an abundance of input to make certain that every aspect of the design would match our <br />needs. Clever details like the plaza area with dyed concrete stripes that could double as <br />overflow parking stalls or the place for an art fair or farmer’s market, an amphitheater for <br />outdoor classes or entertainment, a fireside room that would serve as a great meeting <br />space or the resident’s civic campus living room. Each space inside the building was <br />designed to be open, bright, airy and efficient...the City of Fridley is thrilled with its new, <br />beautifully designed complex and our choice of the BKV Group. <br />SCOTT J. HICKOK AICP <br />I will say that BKV and their team did an amazing job in designing multiple <br />“ <br />facilities that meet citizens needs and created efficiency in workspace utilization <br />and utility demands. The expert work done by BKV Group will service the <br />citizens of Wright County for many decades to come thanks to their expertise. <br />DAREK VETSCH <br />CHICAGODALLAS MINNEAPOLISWASHINGTON, DC <br />209 South LaSalle Street 1412 Main Street 222 North Second Street 1054 31st Street NW <br />The Rookery, Suite 920 Adolphus Tower, Suite 700Long & Kees Building, Suite 101Canal Square, Suite 410 <br />Chicago, IL 60604Dallas, TX 75202 Minneapolis, MN 55401 Washington, DC 20007 <br />P 312.279.0470P 469.405.1196 P 612.339.3752P 202.595.3173 <br />WWW.BKVGROUP.COM <br />Qbhf!:4!pg!596 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.