My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 05052025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 05052025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:56:41 AM
Creation date
5/13/2025 9:56:33 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
5/5/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qbhf!93!pg!248 <br />2024 CIP2024 CIP <br />46,38416,62618,740 <br />$ $ <br />$ 2025 CIP$ 2025 CIP$ 2025 CIP <br />$ 2025 CIP <br />. <br />t <br /> <br />it <br />tion <br />60,00013,616 <br />Attachment 1: Over $10,000 Items for Purchase or Sale/Trade-in <br />200,000 <br />BudgetP.O.Budget / <br />AmountAmountCIP <br />$ $ <br />$ $ 16,875$ 23,520$ 56,362 <br />y <br />(a)(c) <br />(b)(d)25,000 <br />Ford F250 4x4 <br />Acorn Park Irrigation System <br />Lift Gate, Rear Camera, Sensor Bar, and Plow <br />Midway Ford <br />Crysteel Truck Equipment <br />Advanced Coating Systems, Inc.Powder Coating the Iron Fences at Lexington Park <br />The front snow plow is the what would be fitted and attached to the new Ford F250 4x4, shown in the previous line. To complete the set up of the Ford F250 4x4, cameras, sensors, and <br /> winter grade hydraulics are to be installed for intended use ofthe vehicle. Due to the year delay in purchase, the cost of the plow increased $897. This has all been included within <br /> the approved 2024 CIP as part of the 2012 Ford F350 replacement.of the playground equipment. The fence will be redone with rust inhibitive epoxy primer and topcoat with 2-part high <br /> solids polyurethane. This is budgeted in the general PIP/CIP for 2025.The irrigation system at Acorn Park is aging and has had multiple leaks in the past calendar year. By conducting <br /> the repairs, will prevent leaks in that system. This is part of the PIP/CIP 2025 budget which has 25k toward irrigation replacements.This purchase is to top off the engineered wood <br /> fiber at Howard Johnson Park and Central Park (Dale St E). The engineered wood fiber is mandated for safety and ADA access to the playgrounds. This is part of the general PIP/CIP <br /> 2025 budget which has $181,260 remaining.At the Harriet Alexander Nature Center, the siding, soffit, and fascia are being replaced as they are all at the "failed" condiThree quotes <br /> were received for the work and this is the lowest bid. This is part of the Shelter/Buildings PIP/CIP 2025 which has $64k budgeted. <br />This vehicle is part of the 2024 CIP budget and was approved on 5/6/2024, however the vendor was unable to provide the goods and the purchase order was voided. This is a scheduled replacement <br /> of the 2012 Ford F350 Super Duty Pick-up used at the Skating Center in the winter and the Golf Course in the summer. This vehicle will be used to plow all winter, and pull trailers <br /> in the summer. Due to the change from a Dodge Ram 2500 to the Ford F250 and the delay in purchase, the cost was increased by $3,211. The current 2012 Ford F350 will be sold at auction <br /> with the proceeds from the sale being split evenly between the Parks and Recreation Vehicle & Equipment Fund and the Golf Course.The two iron fences, 130 foot and 26 foot, at Lexington <br /> Park is being stripped and redone in coordination with the replacemen <br />(f) <br />(a)(c)(e) <br />(b)(d) <br />Key <br />DivisionVendorDescriptionKe <br />Parks & RecreationParks & RecreationParks & RecreationParks & RecreationAnderson Irrigation, Inc.Parks & RecreationMidwest GroundcoverEngineered Wood Fiber (Safety Surface)(e)181,260Parks <br /> & RecreationWild ConstructionNature Center Siding, Soffit, and Fascia Replacement(f)64,000 <br />(Skating Center/Golf Course)(Skating Center/Golf Course) <br />General Purchases or Contracts <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.