My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 05192025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 05192025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 12:49:08 PM
Creation date
5/20/2025 12:49:01 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
5/19/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Braun Intertec Corporation Phone: 952.995.2000 <br />11001 Hampshire Avenue SFax:952.995.2020 <br />Minneapolis, MN 55438Web:braunintertec.com <br />May 13, 2025Proposal QTB214784 <br />Erik Henricksen, PE <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />Re:Proposal for Construction MaterialsTesting Services <br />City of Roseville 2025 Pavement Management Project <br />City Project No. 25-04 <br />Various residential streets in Roseville, Minnesota <br />Dear Mr. Henricksen: <br />Braun IntertecCorporation is pleased to submit this proposal to provide construction materials testing <br />services for the City of Roseville 2025 Pavement Management Projectin Roseville, Minnesota. <br />We have completed the Pavement and Geotechnical Evaluation Report for this project, so we have a <br />unique understanding of the site and construction challenges. We can aid the construction team by <br />applying this experience and transferring our knowledge developed during the design phase which will <br />provide professional continuity to the construction. Our work on the project to date gives us familiarity <br />with the project team and design development,which allows us to understand some of the <br />considerations used when developing the project’s design. <br />Our Understanding of Project <br />This project will include two different pavement management techniques,a mill and overlay and a full <br />depth reclamation. The first technique is a mill and overlay of various residential streets with new <br />bituminous pavementincluding: Snelling AvenueNorth, Snelling Curve,Rose Place, Pascal Street, Arona <br />Street, Simpson Street, Sextant Avenue, Transit Avenue, Holton Street, Albert Street, Sheldon Street, <br />County Road B2 Frontage Road, Brooks Avenue, Woodlyn Avenue, Farrington Court, Galtier Street, and <br />Marion Street.Streets that will be included in the reclamation portion of the project include Woodbridge <br />Street, Woodlyn Avenue and Iona Lane. This techniqueproject will consist of reclaiming the existing <br />aggregate base and apparent aggregate base intothe new base material before a bituminouspavement <br />is placed. There will be spotconcrete curb and gutterand drivewaysreplacements throughout the <br />project as well. <br />Available Project Information <br />This proposal was prepared using the following documents and information. <br />Project plans (unsigned)and specifications prepared by The City of Roseville, dated <br />March 31, 2025. <br />AA/EOE <br />Qbhf!211!pg!226 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.