My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 05192025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 05192025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 12:49:08 PM
Creation date
5/20/2025 12:49:01 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
5/19/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />Proposal QTB214784 <br />May 13, 2025 <br />Page 3 <br /> <br /> (Alternate scope if requested) Mark and observe contractor coring for compliance with <br />project documents. <br /> <br />Consulting, Project Communication and Reporting Services <br /> Project management, including scheduling of our field personnel. <br /> <br /> Review test reports and communicating with you and the parties you may designate such as <br />the project contractor(s), and other project team members, as needed. <br /> <br /> Transmit test results to the project team on a weekly basis. <br /> <br />Basis of Scope of Work <br />The costs associated with the proposed scope of services were estimated using the following <br />assumptions. If the construction schedule is modified or the contractor completes the various phases of <br />the project at different frequencies or durations than shown in this proposal, we may need to adjust the <br />overall cost accordingly. The scope of work and number of trips required to perform these services are as <br />shown in the attached table. Notable assumptions in developing our estimate include: <br /> <br /> <br /> We assume compaction testing on full depth reclamation material will be performed using <br />the Dynamic Cone Penetration (DCP) method; a minimum of two tests will be conducted <br />each trip with three trips assumed. <br /> <br /> We assume four sets of concrete tests will be required to complete the project. <br /> <br /> We assume your on-site construction observer will observe the test rolling for this project. <br /> <br /> We assume bituminous paving requiring sampling and testing will be completed in 9 days for <br />this project. <br /> <br /> We were requested and have added scope of work to locate and mark bituminous cores for <br />nine trips as alternate #1. <br /> <br /> We assume the project engineer of record will review and approve contractor’s quality <br />control submittals and test results. <br /> <br /> You, or others you may designate, will provide us with current and approved plans and <br />specifications for the project. Modification to these plans must also be sent to us so we can <br />review their incorporation into the work. <br /> <br /> We will require a minimum of 24 hours’ notice for scheduling inspections for a specific time. <br />Shorter than 24 hours’ notice may impact our ability to perform the requested services, and <br />the associated impacts will be the responsibility of others. <br /> <br />Qbhf!213!pg!226 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.