My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 06022025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 06022025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 1:51:03 PM
Creation date
6/3/2025 1:50:47 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
6/2/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />File:Subject Properties Identified & Described <br />Immovable Trade Fixtures <br />ItemQtyDescriptionLocationManufacturer <br />H)6 ea.Electrical OutletsProduction Area Contractor <br />Outlets installed near top of wall at <br />each beauty station. <br />Power to the Paragon hair dryers. <br />Includes wiring from service panel. <br />I)6 ea.Bracing/Support for Hair DryersProduction Area Contractor <br />Constructed inside walls to support <br />the weight of Paragon hair dryers. <br />J)22 ea.Can LightsProduction Area Contractor <br />In addition to lights in Items G & H <br />K)4 ea.Plumbing to Shampoo StationsShampoo RoomContractor <br />Supports 4 chairs with integrated sinks <br />Hot and cold water to each sink <br />Drainage line from each sink <br />L)1 ea.Overhead CabinetUtility RoomContractor <br />Wood construction <br />72" long x 30" high x 12" deep <br />Two sets of double doors <br />Interior shelves <br />M)1 ea.L-Shaped CountertopUtility RoomContractor <br />Wood construction <br />90" long x 25" wide with 35" x 25" return <br />Two-basin sink in return <br />Two-door cabinet under sink <br />N)1 ea.Heat Recovery VentilatorUtility RoomLifebreath <br />Installed in ceiling(Contractor) <br />O)1 ea.Water HeaterUtility RoomAO Smith <br />Cyclone XI(Contractor) <br />Items A through O were constructed and/or installed by Rongitsch Construction <br />Company, Inc. Rongitsch also constructed/installed the tenant improvements. Dale <br />Frank Electric Company supplied and installed (hung) some of the light fixtures. <br />Dodd Advisory & Valuation 10 <br />Qbhf!21:!pg!385 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.