My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 06162025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 06162025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 12:28:19 PM
Creation date
7/8/2025 12:27:58 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
6/16/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aldine ROW Vacation <br />Feasibility Memo <br />Summary <br />1.Only have 30’ of potential ROW for a pathway <br />2.There is some support and some opposition to using this ROW for a pathway <br />3.Segment is 590’ long. The 30’ segment has significant amount of trees and would be impacted if a pathway <br />was constructed. <br />4.Costs –Could be either a sidewalk or trail. Costs vary between $84,000 -$177,000 plus additional cost for <br />crosswalk treatments if enhancement were determined to be needed. <br />5.590’ long pathway would provide ¼ mile connection. Without the connection the walk is approximately 1,900 <br />feet (~3.3x) further via Fairview or approximately 2,700 feet (~5x) further via Snelling. <br />6.Based on Pathway Master Plan scoring criteria, the preference points are 7. The current plan has pathway <br />that go from 5-25 so this is on the lower end. <br />Qbhf!61!pg!464 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.