My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 06162025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 06162025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 12:28:19 PM
Creation date
7/8/2025 12:27:58 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
6/16/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br /> <br /> 2-Population is 2,000 to 2,999 <br /> 1-Population is 500 to 1,999 <br /> 0-Population is less than 500 <br />AND <br /> <br />Total employment within 1/4 mile of pathway <br /> 3-Employment is 3,000 or greater <br /> 2-Employment is 2,000 to 2,999 <br /> 1-Employment is 100 to 1,999 <br /> 0-Employment is less than 100 <br />Measurement tool: US Census Block Dataset <br /> <br />3) Connects to regional system. <br />Provides linkage to the larger network of pathways that extend beyond Roseville. The <br />pathway serves longer trips within Roseville and into neighboring cities. <br /> <br /> 3-Regional corridor (county road, regional/state trail, RBTN route) <br /> 2-Local pathway that directly connects to regional corridor or Parks & <br />Recreation System Master Plan Trails and Parks Constellation Link. <br /> 1-Pathway provides local connection only <br />Measurement tool: City’s Pathway map and regional bikeways mapping <br /> <br />4) Addresses a gap or barrier in the transportation network. <br />Addresses a pathway network gap along the transportation network and/or crosses a <br />major barrier. Eliminates a major barrier or safety concern in the pathway network <br />that may inhibit bicycle or pedestrian travel. <br /> 5-Provides enhanced safe crossing (grade separated or improved <br />intersection) of major highway (I-35W, TH 36, Snelling Avenue) or railroad <br /> 4-Completes pathway along A-Minor Arterial roadway <br /> 3-Completes pathway along Other Arterial roadway <br /> 2-Completes pathway along Major Collector roadway <br /> 1-Completes pathway along a Local roadway <br />Measurement tool: City’s Roadway Functional Classification Map <br /> <br />5) Connects to Transit <br />Connects bus stops, transit hubs, or provides a connection to other transit. <br /> 3-Transit Center or park and ride within 1/4 mile of pathway <br /> 2-A-BRT Station within 1/4 mile of pathway <br /> 1-Bus stop within 1/4 mile of pathway <br />October 11, 2021 Page 30 <br />Qbhf!64!pg!464 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.