My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 07072025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 07072025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 12:34:48 PM
Creation date
7/8/2025 12:34:26 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
7/7/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />REQUEST FOR COUNCIL ACTION <br />Date: 7/7/2025 <br />Item No.: 10.b. <br />Department Approval City Manager Approval <br /> <br /> <br />Item Description: Award 2025-2027 Pond Maintenance Program Agreement <br />1 <br />2 Background <br />3 Citywide, there are 200+ public storm ponds that were installed since the 1950’s to meet <br />4 water quality goals, reduce stormwater rate, and help manage localized flooding issues. <br />5 Over time, the ponds fill with sediment and the design functionality diminishes. Staff is <br />6 currently prioritizing ponds to have preliminary engineering completed to quantify the <br />7 material that needs to be removed, determine potential water quality improvements, and <br />8 estimate costs based on removals. <br />9 <br />10 For 2025-2027, 20 ponds have been identified to gather more information. The contractor <br />11 will supply the City with a survey of pond bottoms, pond inlets and outlet elevations, a <br />12 maintenance memo with recommended maintenance activities and estimates, and <br />13 sediment analysis to determine disposal options. <br />14 <br />15 Policy Objectives <br />16 It is City policy to improve and maintain drainage to reduce the risk of localized flooding, <br />17 and to keep infrastructure in good working condition. <br />18 <br />19 Equity Impact Summary <br />20 There should be no equity impacts associated with this agreement as maintaining our <br />21 storm sewer infrastructure benefits all residents and property owners. <br />22 <br />23 Budget Implications <br />24 Staff received one quote for this project, after sending to several contractors. The quote <br />25 was submitted by WSB in the amount of $26,000 for 2025; $30,500 for 2026; and $30,100 <br />26 for 2027. The funding for this work will come from the Storm Infrastructure Rehabilitation <br />27 budget item through the Storm Fund CIP which has an overall budget of $600,000 in 2025. <br />28 <br />29 Staff is comfortable with the quotes as they are in line with previous work completed by the <br />30 contractor. WSB is familiar with the process for collecting data and <br />31 submitting information to the City in a manner that is most efficient and effective. <br />32 <br />33 The City Attorney has reviewed the agreement and is comfortable with the language. <br />Page 1 of 2 <br />Qbhf!:3!pg!488 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.