My WebLink
|
Help
|
About
|
Sign Out
Home
25_0624_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0624_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 12:33:38 PM
Creation date
10/1/2025 12:32:49 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/24/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2025 Pavement Management Project <br />o Work in mill and overlay segments is complete, reclaim segments expected <br />to begin mid -July. <br />• WayfindingSignage <br />o Pedestrian level signs are being manufactured, and permits being obtained <br />for installation fall2025. <br />• Lighting <br />o New streetlights installations byXcel per City request awaiting delivery of <br />poles. <br />o Xcel has begun work to replace Centre Pointe Drive and Arthur Street lighting. <br />• Bike Plan <br />o Awaiting final draft from consultants. Next steps will include review byPWET <br />and the Parks Commission, and the public. <br />o The demonstration project, for the addition of buffer and bollard -protected <br />bike lanes on Hamline Avenue between County Road B and County Road B2, <br />have been striped and staff will install delineators soon. <br />Other agency project updates: <br />• Ramsey County <br />o Dale Street from Lovell Avenue into St. Paul <br />• Minor work continues for more striping and to get the signal atTH36to <br />full operation (it is still on red flash). <br />o HamlineAvenue/ClarmarLane Storm Sewer <br />• County to add to and replace existing storm sewer to address <br />flooding and aging infrastructure in Fall2025. <br />o County Road D from Highcrest Road to 88 <br />• ADA and pavement improvements (mill and overlay) planned for2025 <br />construction. <br />o County Road C 4:3 Conversion from Lexington Avenue to Little Canada Road <br />and bridge over railroad <br />• 4:3 lane conversion with mill and overlay scheduled for 2026. <br />• Bridgeredeckingorreplacementreceivedfederalfunding— schedule <br />TB D. <br />• MnDOT <br />o Snelling Design fromTH 36 to Grey Fox Road <br />• In design for2026 resurfacing and will include off -road pathwaywest <br />of SnellingAvenue from Lydia Avenue to Old Snelling— MnDOT <br />updated their plans to provide a continuous path! ** <br />o TH 280 Design from Wabash Avenue in St. Paul to 135 W <br />• In design for2026 resurfacing. <br />• Other <br />o G Line (Metro Transit) <br />PWET Communications Memo Page 2 <br />Page 11 of 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.