Laserfiche WebLink
FACILITY CONDITION ASSESSMENT <br />1 <br />Facility List Original Construction Date Facilit} <br />2003Garage <br />East Garage _ -= <br />North Garage _ <br />Clffice Space <br />_ North Gan..- <br />11.947 St <br />0 <br />KRAUS-ANDERSON,,, <br />Critical (0.51-1.00) <br />31,379 0.1793 <br />9,460 0.1960 FCI — Deferred Maintenance Totals <br />14,132 0.2972 Building Replacement Costs <br />7,190 je 0-1734 <br />Poor(0. 31-0.50) <br />Fair (0.11-0.30) <br />Good (0.06-0.10) <br />FCqqk-- - <br />ExceOent (0.0-0.05) <br />1 0 <br />Facility Preservation of Exterior Envelope & Site Prior to Renovation <br />(not inclusive of demo of North and East Garage) <br />02-Sitework/Building <br />Earthwork, $292,414, <br />-_ 8% <br />05-Exterior Enclosure, <br />$914,535 , 24% <br />06-Roof, $2,559,306 , <br />68% <br />Category <br />Sum of Total <br />with Inf. <br />02-Sitework/Building Earthwork <br />$ <br />292,414 <br />05-Exterior Enclosure <br />$ <br />914,535 <br />06-Roof <br />$ <br />2,559,306 <br />Grand Total <br />$ <br />3,766,255 Page 34 <br />f 64 <br />