Laserfiche WebLink
COST SUMMARY <br />• Cost Estimate is based on Rough Order of Magnitude (ROM); utilizing historical construction cost data <br />• Includes Design/Construction Contingency & Construction Escalation to 2027 mid -point <br />• Soft Costs include costs not directly tied to the physical construction of the building; they include - <br />Inspections, Permits, A/E fees, Furniture, Etc. <br />ROSEVILLE CIVIC CAMPUS I MASTER PLAN UPDATE <br />CITY COUNCIL UPDATE 1 06/16/2025 Qhm g c�"�� a o <br />