My WebLink
|
Help
|
About
|
Sign Out
Home
25_0826_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0826_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 12:38:31 PM
Creation date
10/1/2025 12:36:58 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/26/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MPCA, and other packaging and resource vendors. A video with short vendor <br />interviews is posted on our website to help reach restaurants that were notable to <br />attend. <br />• Staff met with consultant paleBLUEdot to kickoff the Climate Equity Action Plan. A <br />website with info and a survey is now available at cityofroseville.com/climate- <br />equity. <br />• Staff organized and held Roseville's first cloth ingswap on Thu rsday,August21 at the <br />OVAL. <br />• The cart rollout is officially complete, and all carts are now being managed by Waste <br />Management. Residents can call Roseville Public Works or Waste Management to <br />request a new size or additional cart. <br />• Waste Management (WM) officially started recycling collection in Roseville on July 1. <br />Staff are continuingto work with WM to address several issues that include <br />sporadic and missed collections at multi -unit buildings, residential curbside misses, <br />call center not providing accurate information, etc. Staff are hopeful these issues <br />will be resolved in the next couple of months. <br />Maintenance Updates: <br />Street and Storm <br />o Jake Frisell, our newest Maintenance Worker II, starts in Streets on <br />August 27. <br />o Intermittent street sweeping sensitive areas. <br />o Annual Flex Seal on storm sewer structures. <br />o Assistwith Water Gate Valve replacements. <br />o Annual crack sealing underway. <br />0 9th turn for compost, readyto stack into pile. <br />o State Fair no parking/Good neighbor signs installed. <br />o Ongoing storm sewer maintenance, sign work, R.O.W. mowing. <br />Water and Sanitary Sewer <br />o Continued inspections for water service line inventory. <br />o Installed new motor at St. Croix lift station and ordered new pump for <br />Arona lift station. <br />0 16" gate valve replaced (Fairview Ave N. So. of Co Rd 132) <br />o Continued underground locates, weekly lift station inspections, <br />collection of water samples. <br />PWET Communications Memo Page 3 <br />Page 6 of 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.