My WebLink
|
Help
|
About
|
Sign Out
Home
25_0930_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_0930_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 12:59:02 PM
Creation date
10/1/2025 12:56:59 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/30/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Stormwater Update <br />Project/Prioritization Overview <br />�fflitlk <br />or <br />1 <br />Y1 <br />» <br />1. <br />•0 <br />7* <br />hl <br />• Prioritizing projects and maintenance <br />• Annual Pavement Management Projects <br />• Standalone projects <br />• Major drainage issues <br />• Available staff and funding resources <br />• Resident comments <br />• Drainage/flooding concerns (high priority) <br />• Algal blooms (low priority) <br />• Typical planning scope <br />• 12 - 24 months prior to maintenance <br />• Bathymetric surveys <br />• Inspect inlets and outlets <br />• Sediment and/or core samples <br />• Preliminary estimate <br />• Evaluate current high-water elevations <br />• 0 — 18 months prior to maintenance: <br />• Construction plans <br />• Dredging <br />• Replacing inlets and outlets <br />• Modify inlets or outlets as needed for drainage improvements <br />• Permitting <br />• Outreach and notification to property owners <br />
The URL can be used to link to this page
Your browser does not support the video tag.