2025 Stormwater Update <br />Partner Projects <br />4.5 RCD2-5: MODIFY JONES LAKE OUTLET AND DREDGING <br />The Jones Lake Project is a critical project as it has the potential to provide a significant amount <br />of new flood storage. The conceptualized project on Jones Lake will lower the normal water <br />0.5 feet to an elevation of 891.5. Further lowering of the outlet, which would be considered an <br />"improvement" to RCD 2 under MS 103E, is limited by the downstream channel and storm <br />sewer elevations including the likely infeasibility of meeting MS 103E requirements. Design <br />parameters were used to keep the raised 100-year elevation at least 2-feet below adjacent <br />structures. The lower normal water level, modified outlet and proposed dredging creates use of <br />an additional 112.22 acre-feet of live storage_ <br />Joint project between Rice Creek Watershed District (RCWD), City of <br />Saint Anthony, City of New Brighton, and City of Roseville <br />Estimated project cost of -$10 million <br />Bonding priority of the RCWD <br />