My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 09152025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 09152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:48:55 PM
Creation date
10/21/2025 2:48:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
9/15/2025
Meeting Type
Work Session
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />All payments to the Architect shall be governed by the Prompt Payment of Local Government Bills, Minnesota Statutes, <br />Section 471.425 (ÐPrompt Payment ActÑ), provided however that the interest rate for payment due but unpaid shall be four <br />percent (4%) per annum. <br /> <br />ARTICLE 11 COMPENSATION <br />§ 11.1 For the ArchitectÓs Basic Services described under Article 3, the Owner shall compensate the Architect as follows: <br /> <br />.1 Stipulated Sum <br /> (Insert amount) <br /> <br /> <br /> <br />.2 Percentage Basis <br /> (Insert percentage value) <br /> <br /> ( ) % of the OwnerÓs budget for the Cost of the Work, as calculated in accordance with Section <br />11.6. <br /> <br />.3 Other <br /> (Describe the method of compensation) <br /> <br /> <br /> <br />§ 11.2 For the ArchitectÓs Supplemental Services designated in Section 4.1.1 and for any Sustainability Services required <br />pursuant to Section 4.1.3, the Owner shall compensate the Architect as follows: <br />(Insert amount of, or basis for, compensation. If necessary, list specific services to which particular methods of compensation <br />apply.) <br /> <br /> <br /> <br />§ 11.3 For Additional Services that may arise during the course of the Project, including those under Section 4.2, the Owner <br />shall compensate the Architect as follows: <br />(Insert amount of, or basis for, compensation.) <br /> <br /> <br /> <br />§ 11.4 Compensation for Supplemental and Additional Services of the ArchitectÓs consultants when not included in Sections <br />11.2 or 11.3, shall be the amount invoiced to the Architect plus percent ( %), or as follows: <br />(Insert amount of, or basis for computing, ArchitectÓs consultantsÓ compensation for Supplemental or Additional Services.) <br /> <br /> <br /> <br />§ 11.5 When compensation for Basic Services is based on a stipulated sum or a percentage basis, the proportion of <br />compensation for each phase of services shall be as follows: <br /> <br />Schematic Design Phase percent ( %) <br /> <br />Design Development Phase percent ( %) <br />Construction Documents Phase percent ( %) <br />Construction Phase percent ( %) <br /> <br />Total Basic Compensation one hundred percent ( 100.00 %) <br /> <br />AIA Document B133 Î 2019. Copyright ¨ 2014, and 2019. All rights reserved. ÐThe American Institute of Architects,Ñ ÐAmerican Institute of Architects,Ñ ÐAIA,Ñ the <br /> <br />AIA Logo, and ÐAIA Contract DocumentsÑ are trademarks of The American Institute of Architects. This draft was produced at 13:48:18 CDT on 08/13/2025 under <br />24 <br />Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />® <br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeef442e4498d096839) <br /> <br />A24 | BKV GROUP <br />Qbhf!329!pg!354 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.