Laserfiche WebLink
Total Fee LPCDS Total Fee MOC Total Fee by Total <br />Project Phase <br />Project Phase <br />$0 $0 $0 <br />Data Collection / Programming <br />$0 $0 $0 <br />Concept Design <br />$0 $0 $0 <br />Schematic Design <br />$0 $0 $0 <br />Design Development <br />$0 $0 $0 <br />Construction Documents <br />$0 $0 $0 <br />Bidding & Permitting Assistance <br />$0 $0 $0 <br />Construction Administration <br />$0 $0 $0 <br />Close-Out <br />$0 $0 $0 <br />Sub-Total: Consultant Fees <br />$0 $0 $0 <br />Sub-Total: Reimbursables <br />$0 $0 $0 <br />Total Fees <br /> <br />* Consultant Exclusions Cost ($) <br /> <br /> <br />Alternate: Design the facility to meet a higher sustainability <br />*$ <br /> <br />requirement, such as B3 requirements. <br /> <br />ΫhƷŷĻƩͶ Ϋυ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />* Consultant to expand Exclusions list as needed with associated added lump sum <br />costs or unit costs for each item <br />Qbhf!79!pg!354 <br /> <br />