My WebLink
|
Help
|
About
|
Sign Out
Home
res_8579
Roseville
>
City Council
>
City Council Resolutions
>
08xxx
>
8500
>
res_8579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 8:34:02 AM
Creation date
12/1/2004 1:58:14 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
8579
Resolution Title
Transferring community television programming responsibilities from Group W Cable to the North Suburban Cable Commission, and AUTHORIZING THE North Suburban Cable Commission to undertake tasks required for the implementation of the above referenced r
Resolution Date Passed
6/11/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Dated: <br /> <br />NORTH SUBURBAN AREA <br />PROPOSAL COMPLIANCE ANALYSIS <br /> <br />The following are requirements of the proposal for cable <br />television service to the North SUburban Cable service territory. <br />Please review these requirements and explain in detail under <br />the "Compliance" column your compliance with these requirements. <br />Should you require more space for your response, either expand <br />the forms, or reference attached material. If you believe your <br />compliance has been modified or excused by official action of <br />the Cable Commission, or otherwise, please explain with specificity, <br />referencing and quoting the official document which modifies <br />or excuses your obligations. <br /> <br />Note: Any failure to list a proposal requirement shall <br />in no way excuse your existing obligation to comply. This list <br />is only a summary for the purpose of general compliance measurement <br />and evaluation. The original proposal and any related documents <br />shall remain the regulatory instruments of the member cities <br />and the Commission. <br /> <br />Requirements <br /> <br />Compliance <br /> <br />Franchisee commits: <br /> <br />1. To construct a dual cable system <br />with one activated cable providing <br />59 activated channels downstream <br />to subscribers and 4 activated <br />channels upstream~ plus a full <br />video information retrieval channel; <br />and to partiçìpate in a review <br />of the need to activate the second <br />cable in Years 3, 5, 8, and 10 <br />of the franchise periods. <br /> <br />2. To provide subscribers with three <br />serviçe tier options, including <br />a 22-channel universal service, <br />a 59-channel basic service, and <br />a 59-channel interactive service. <br /> <br />3. To complete system by November 12, <br />1984, making available, at that <br />time, service to all dwelling <br />units within the initial service <br />area, and completing the institutional <br />network as proposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.