My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 11102025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 11102025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 10:42:01 AM
Creation date
11/13/2025 10:41:14 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
11/10/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 1.1.3 The Owner’s budget for the Guaranteed Maximum Price, as defined in Article 6: <br />(Provide total and, if known, a line item breakdown.) <br />The Owner’s budget for construction is 11,000,000. <br />§ 1.1.4 The Owner’s anticipated design and construction milestone dates: <br />.1 Design phase milestone dates, if any: <br />Design completion: Winter2025-26. Design must be complete so Project can bid nolater than Spring 2026, in <br />order to start in September or October of 2026. <br />.2 Construction commencement date: <br />September/October 2026 <br />.3 Substantial Completion date or dates: <br />TBD <br />.4 Other milestone dates: <br /> N/A <br />§ 1.1.5 The Owner’s requirements for accelerated or fast-track scheduling, or phased construction, are set forth below: <br />(Identify any requirements for fast-track scheduling or phased construction.) <br /> N/A <br />§ 1.1.6 The Owner’s anticipated Sustainable Objective for the Project: <br />(Identify and describe the Owner’s Sustainable Objective for the Project, if any.) <br /> N/A <br />§ 1.1.6.1 If the Owner identifies a Sustainable Objective, prior to commencement of the Work, the Owner and Construction <br />Manager shall endeavor to define the terms, conditions, and services related to the Owner’s Sustainable objective and may <br />complete and incorporate AIA Document E234™–2019, Sustainable Projects Exhibit, Construction Manager as Constructor <br />Edition, into this Agreement to define the terms, conditions and services related to the Owner’s Sustainable Objective. If <br />E234–2019 is incorporated into this agreement, the Owner andConstruction Manager shall incorporate the completed E234– <br />2019 into the agreements with the consultants and contractors performing services or Work in any way associated with the <br />Sustainable Objective. <br />§ 1.1.7 Other Project information: <br />(Identify special characteristics or needs of the Project not provided elsewhere.) <br /> N/A <br />§ 1.1.8 The Owner identifies the following representatives in accordance with Section 4.2, with each representative having <br />equal authorityunder this Agreement: <br />(List name, address, and other contact information.) <br />Jesse Freihammer, Public Works Director <br />City of Roseville <br />AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of <br />Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects.This draft was produced at 13:53:13 CDT <br />3 <br />on 08/18/2025 under Subscription No.20250116558 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance <br />® <br />with the AIA Contract DocumentsTerms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aedf442e4498d096805) <br />Qbhf!245!pg!74: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.