|
Construction Change Directives
<br />1.1.1, 3.4.2, 3.11, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1
<br />Construction Schedules, Contractor’s
<br />3.10, 3.11, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2
<br />Contingent Assignment of Subcontracts
<br />5.4, 14.2.2.2
<br />Continuing Contract Performance
<br />15.1.4
<br />Contract, Definition of
<br />1.1.2
<br />CONTRACT, TERMINATION OR SUSPENSION OF THE
<br />5.4.1.1, 5.4.2, 11.5, 14
<br />Contract Administration
<br />3.1.3, 4, 9.4, 9.5
<br />Contract Award and Execution, Conditions Relating to
<br />3.7.1, 3.10, 5.2, 6.1
<br />Contract Documents, Copies Furnished and Use of
<br />1.5.2, 2.3.6, 5.3
<br />Contract Documents, Definition of
<br />1.1.1
<br />Contract Sum
<br />2.2.2, 2.2.4, 3.7.4, 3.7.5, 3.8, 3.10.2, 5.2.3, 7.3, 7.4, 9.1, 9.2, 9.4.2, 9.5.1.4, 9.6.7, 9.7, 10.3.2, 11.5, 12.1.2, 12.3, 14.2.4, 14.3.2,
<br />15.1.4.2, 15.1.5, 15.2.5
<br />Contract Sum, Definition of
<br />9.1
<br />Contract Time
<br />1.1.4, 2.2.1, 2.2.2, 3.7.4, 3.7.5, 3.10.2, 5.2.3, 6.1.5, 7.2.1.3, 7.3.1, 7.3.5, 7.3.6, 7, 7, 7.3.10, 7.4, 8.1.1, 8.2.1, 8.2.3, 8.3.1, 9.5.1,
<br />9.7, 10.3.2, 12.1.1, 12.1.2, 14.3.2, 15.1.4.2, 15.1.6.1, 15.2.5
<br />Contract Time, Definition of
<br />8.1.1
<br />CONTRACTOR
<br />3
<br />Contractor, Definition of
<br />3.1, 6.1.2
<br />Contractor’s Construction and Submittal Schedules
<br />3.10, 3.12.1, 3.12.2, 4.2.3, 6.1.3, 15.1.6.2
<br />Contractor’s Employees
<br />2.2.4, 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, 11.3, 14.1, 14.2.1.1
<br />Contractor’s Liability Insurance
<br />11.1
<br />Contractor’s Relationship with Separate Contractors and Owner’s Forces
<br />3.12.5, 3.14.2, 4.2.4, 6, 11.3, 12.2.4
<br />Contractor’s Relationship with Subcontractors
<br />1.2.2, 2.2.4, 3.3.2, 3.18.1, 3.18.2, 4.2.4, 5, 9.6.2, 9.6.7, 9.10.2, 11.2, 11.3, 11.4
<br />Contractor’s Relationship with the Architect
<br />1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2,
<br />9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.4, 15.1.3, 15.2.1
<br />Contractor’s Representations
<br />3.2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2
<br />Contractor’s Responsibility for Those Performing the Work
<br />3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8
<br />Contractor’s Review of Contract Documents
<br />3.2
<br />AIA Document A201 –2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights
<br />reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents”are trademarks of The
<br />6
<br />American Institute of Architects.This draft was produced at 10:50:07 CDT on 08/19/2025 under Subscription No.20250116558 which expires on , is not for
<br />®
<br />resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract DocumentsTerms of Service. To report copyright
<br />violations, e-mail docinfo@aiacontracts.com.
<br />User Notes: (640e2aedf442e4498d0967fa)
<br />Qbhf!27:!pg!74:
<br />
<br />
|