Laserfiche WebLink
314.053 Permit and Plan/Project Review Fees <br />ATTACHMENT 1 <br />Fee DescriptionCity Code2025 Amount2026 AmountNOTES <br />37 <br />Erosion control inspection permit: <br />38< 5,000 SF (within 300' of water resource)$50.00 <br />39< 1/2 acre (residential remodel only)$300.00$325.00 <br />405,000 SF to 1 acre (residential only, New Homes)$1,250.00 <br />411 - 5 acres (Non Residential)$1,750.00 <br />42> 5 acres (Non Residential)$2,500.00 <br />43 <br />Erosion control permit renewal: <br />< 5,000 SF (within 300' of water resource)$50.00NEW <br />44< 1/2 acre (residential remodel only)$200.00$300.00 <br />455,000 SF to 1 acre (residential only, New Homes)$750.00 <br />461 - 5 acres (Non Residential)$1,000.00 <br />47> 5 acres (Non Residential)$1,250.00$1,500.00 <br />48 Grading Permit Fee - Engineering: <br />49<5,000 SF (within 300 feet of water resource)$75.00 <br />50< 50 cubic yards$0.00 <br />5151 - 250 cubic yards$150.00 <br />52251 - 1,000 cubic yards$250.00 <br />531,001 - 10,000 cubic yards$400.00 <br />54> 10,000 cubic yards$750.00 <br />551017$35.00 <br />Stormwater impact fee (per cubic foot) <br />56 Stormwater residential permit: <br />57Initial$300.00 <br />58 Stormwater Permit Review <br />59< 1 acre$75.00 <br />601 - 5 acres$150.00$200.00 <br />61> 5 acres$250.00$300.00 <br />62 House Moving Permit Fee: <br />63Over private property only$95.00 <br />64Over public streets$137.00 <br />65Investigation fee (hourly)$76.00$87.00 <br />66 Manufactured Home Permit Fee (new installation)$275.00 <br />67$84.00$87.00 <br />Mechanical Permit Fee - Residential: <br />68Additional for each fixture$10.00 <br />69New construction, misc. work & gas piping1.28% of job cost + $841.28% of job cost + $87 <br />70Minimum fee$84.00$87.00 <br />71In floor heat$84.00$87.00 <br />72 Mechanical Permit Fee - Commercial (All)1.28% of job cost + $841.28% of job cost + $87 <br />73 Plan Review Fee:65% of permit fee <br />74 <br />Plumbing Permit Fee: Residential <br />75Minimum fee$84.00$87.00 <br />76Additional for each fixture$10.00 <br />77Backflow prevention device$10.00 <br />78New construction, misc. work & gas piping1.28% of job cost + $841.28% of job cost + $87 <br />79 Plumbing Permit Fee: Commercial 1.28% of job cost + $841.28% of job cost + $87 <br />80Minimum fee$84.00$87.00 <br />81 Sewer Connection Permit Fee - Community Develop: <br />82Residential$84.00$87.00 <br />83Commercial$304.00$313.00 <br />84Repair$84.00$87.00 <br />85Disconnect: residential$84.00$87.00 <br />86Disconnect: commercial$168.00$173.00 <br />2 <br />Qbhf!99!pg!74: <br /> <br />