My WebLink
|
Help
|
About
|
Sign Out
Home
2025-07-22 PWETC Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Minutes
>
202x
>
2025
>
2025-07-22 PWETC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2025 3:46:02 PM
Creation date
11/17/2025 3:45:57 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
7/22/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
progress. The Dale/Owasso lift station has been completed. Sewer cleaning and <br />lining are underway, and mill and overlay projects are ongoing. She noted that staff <br />has not yet received the wayfinding signage, but public engagement will be <br />conducted by the end of the year. <br />Ms. Lowry reviewed the Ramsey County and MnDOT project and noted that the <br />City was fully staffed with new hires and interns. She also reviewed the Water <br />Efficiency Rebate Program. <br />Chair Ficek arrived at 6:38 p.m. and commented on the Hamline bike experiment, <br />noting that it has been successful with only afew pylons hit and has slowed traffic. <br />Ms. Lowry mentioned collecting data for speed analysis and traffic counts before <br />and after the project. <br />The Commission discussed snow clearing responsibilities, with Ms. Lowry <br />explaining that the City would handle bike lanes and the county would handle the <br />roads. <br />5. Engineering Intern Presentations <br />Assistant Public Works Director / City Engineer Jennifer Lowry said two of the <br />city's engineering summer interns attended the meeting to give a brief presentation <br />of their work and experiences. <br />Ms. Anisa Riaz provided her background history and gave a presentation on her <br />work in the city so far, which included pavement management, erosion control <br />inspection, and traffic counts. <br />Mr. Reily Sieren provided his background and gave a presentation on his work in <br />the city this summer, which included traffic counts, erosion control inspections, the <br />guardrail project, and the Warren Pathways project. <br />Both interns talked about their fieldwork experiences, challenges, and favorite parts <br />of their internship. <br />6. Civic Campus Master Plan <br />Assistant Public Works Director / City Engineer Jennifer Lowry provided an update <br />on the Civic Campus Master Plan, architectural RFP, and RFQ for a construction <br />manager at risk. <br />Discussion continued on the importance of the Civic Campus Master Plan and the <br />role of the committee involving commissioners, residents, and the VFW. <br />City Council Joint Meeting Review <br />Chair Ficek and Vice Chair Hodder briefed the Commission on their joint meeting. <br />They emphasized the importance of planning the agenda for the upcoming year. <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.