Laserfiche WebLink
IGNFRI I, ,161 <br />Project Preference List <br />Pathway Master Plan <br />Total <br />Map Ref. <br />Project Name <br />Description <br />TYPE <br />NOTES <br />and Parks Constellation <br />Points <br />Plan Rank <br />Pathway Master Plan Segment on Arterial Roadway with more than 4,000 ADT, with no pathway on either side of the roadway. <br />Parks and Recreation Master Plan Constellation Link <br />28 <br />Snelling Avenue* <br />Develop off road pathway between County Road B and County Road C <br />Trail/Sidewalk <br />25 <br />1 <br />4A <br />County Road C (A) <br />Construct an on -road pathway from Lexington Avenue to Victoria St. <br />On Road <br />2026 Project <br />23 <br />2 <br />9 <br />Snelling Avenue South of Highway 36 <br />Complete pathways along Snelling Avenue for improved access to A-BRT transit stations. <br />Trail/Sidewalk <br />22 <br />3 <br />A pedestrian bridge across Highway 36 and pathway connection between Rosedale and HarMar Mall. <br />TH 36 Study - Snelling <br />16 <br />Rosedale to HarMar Connection <br />Trail/Sidewalk <br />Bridge 2030 <br />22 <br />3 <br />Complete off -road pathway on the east side of Lexington Avenue from County Road C to County Road D. <br />Only C2-Cty D is missing <br />12C <br />Lexington Avenue ( C) <br />Trail <br />- Modify <br />22 <br />3 <br />Complete off -road pathway on the east side of Lexington Avenue from Larpenteur Avenue to County Road <br />Only Larpentuer to <br />B <br />Roselawn is Missing - <br />12A <br />Lexington Avenue (A) <br />Sidewalk <br />Modify <br />21 <br />6 <br />Complete off -road pathway on the east side of Lexington Avenue from County Road B to County Road C. <br />2026 project. After <br />2026 only missing B2-C <br />12B <br />Lexington Avenue (B) <br />Trail/Sidewalk <br />Modify <br />19 <br />7 <br />Construct an on -road pathway from Victoria St to Dale St. <br />2026 Project for on <br />4B <br />County Road C (B) <br />On Road <br />road - Modify? <br />19 <br />7 <br />Complete both on- and off -road pathways within the County Road C-2 alignment from Snelling Avenue to <br />On Road & <br />3A <br />County Road C-2 (A) <br />Hamline Ave <br />Trail/Sidewalk <br />Should we do both? <br />18 <br />9 <br />Construct an on -road pathway from Dale St to Western Ave. <br />2026 Project for on <br />4C <br />County Road C (C) <br />On Road <br />road - Modify? <br />18 <br />9 <br />Complete both on- and off -road pathways within the County Road C alignment from Western Ave to Rice <br />On Road & <br />2026 Project for on <br />4D <br />ICounty Road C (D) <br />St. <br />Trail/Sidewalk <br />road - Modify? <br />18 <br />9 <br />Cleveland Avenue <br />Complete off -road pathway segments between County Road C and County Road D <br />N <br />Partial completed - <br />6 <br />Trail/Sidewalk <br />Modify <br />17 <br />12 <br />13 <br />Rice Street <br />A <br />Complete an off -road pathway from County Road C to the north City boundary. <br />IR <br />Trail/Sidewalk <br />Missing C-C2 <br />17 <br />12 <br />An off -road trail from County Road C to County Road C-2. <br />2026 Project - Can <br />25A <br />Hamline Avenue A <br />Trail <br />Remove <br />17 <br />12 <br />Victoria Street (north of C) <br />Develop an on- road and off -road pathway from County Road C to County Road D. <br />10 <br />Trail/Sidewalk <br />2028 Project -Modify <br />16 <br />15 <br />Constellation Link C3 <br />Develop a constellation link pathway along Woodhill Drive between Hamline Avenue and Civic Center <br />CC-3 <br />Drive to connect to Howard Johnson Park <br />Trail/Sidewalk <br />Potential Add <br />16 <br />15 <br />36 <br />Snelling Service Dr E <br />Develop an off road pathway along the east side of the East Snelling Service Drive <br />Trail/Si <br />16 <br />15 <br />Develop both on -and off -road pathways within the County Road C-2 alignment from the west City <br />On Road & <br />2 <br />County Road C-2 West of Snelling <br />Boundary to Snelling Avenue. This corridor would include a pedestrian bridge across 1-35W. <br />Trail/Sidewalk <br />15 <br />18 <br />Work with Arden Hills to develop a regional pathway connection along Snelling Avenue to Old Snelling <br />TH 51 connection to Old Snelling (Arden Hills) <br />Avenue in Arden Hills connecting Roseville to Mounds View High School, Valentine Hills Elementary <br />17Trail <br />School, Bethel College, Lake Johanna Park and County Road E2 commercial businesses. <br />MnDOT 2026 Project - <br />8 <br />Can Remove <br />15 <br />18 <br />Page 1 of 4 <br />Page 22 of 35 <br />