Laserfiche WebLink
Attachment 2 <br />2026 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Parks <br />Project/Initiative Title: CP Dale Street Athletic fields (Soccer Fields) <br />Total Estimated Cost: $30,000 ($15,000 per field) <br />Funding Source: Park Improvement Fund 411 <br />Annual Operating Budget Impact: <br /> <br /> <br /> <br />Project/Initiative Description: <br />This item involves interval upgrades to the playing field in order to maintain a level of safety, aesthetics <br />and playability. Full field updates are on a rough 5-year interval per industry standards and as identified <br />in the Asset Management Program. This includes major uneven areas including new sod and as needed. <br /> <br />This may include fence fabric and post replacement as needed. Inspection by staff is bi-annually spring <br />and fall. Intervals are adjusted according to the inspection program. <br /> <br />A preliminary analysis of this site indicates that these funds will be utilized to improve lowspots/a field <br />wear. <br /> <br />Asset Location: <br />Central Park Dale Street <br />2531 Dale Street N. <br />Current Asset Installation Year: <br />Expected Lifespan for Asset: <br />5 Years <br /> <br />Page 68 <br />Qbhf!259!pg!472 <br /> <br />