Laserfiche WebLink
Attachment 2 <br />2026 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Parks <br />Project/Initiative Title: CP Waterfall Bridges <br />Total Estimated Cost: $50,000 <br />Funding Source: Parks Improvement Fund 411 <br />Annual Operating Budget Impact: <br /> <br /> <br /> <br />Project/Initiative Description: <br />The two Central Park Bridges at the waterfall will be inspected by a structural engineer from the county <br />in the fall of 2025. Following that inspection we will receive a report on what (if any) improvements <br />need to be made on the bridges. <br />If their current condition is acceptable, this item will be deferred to the appropriate year. <br />Asset Location: <br />Central Park <br />2540 Lexington Ave N. <br />Current Asset Installation Year: <br />Expected Lifespan for Asset: <br />25 Years <br />Page 71 <br />Qbhf!262!pg!472 <br /> <br />