My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 12082025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 12082025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 2:27:14 PM
Creation date
12/9/2025 2:26:52 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
12/8/2025
Meeting Type
Special
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />2026 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Street Lighting <br />Project/Initiative Title: Long Lake Road System (227448) <br />Total Estimated Cost: $20,000 <br />Funding Source: Street Lighting Equipment Fund (property tax) <br />Annual Operating Budget Impact: $0 <br /> <br /> <br /> <br />Project/Initiative Description: <br />Replace existing Long Lake lighting system. The original system was installed in 1999 and was <br />leased from Xcel Energy. In 2024, the lease expired and the City took ownership. The system <br />needs replacement due to its age. The new lighting system would upgrade all fixtures and wiring <br />to new standards. The new lights would be light emitting diode (LED), replacing the exiting high <br />pressure sodium (HPS) lights which should reduce long term operating and maintenance costs. <br />Location: <br />Long Lake Road between TH 36 and Terminal Road <br /> <br />Page 83 <br />Qbhf!274!pg!472 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.