My WebLink
|
Help
|
About
|
Sign Out
Home
26_0127_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0127_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 8:53:57 AM
Creation date
1/29/2026 8:52:23 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/27/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />1 ' 1 <br />. . b .FM Wag <br />SNOW AND ICE CONTROL POLICY FOR STREETS AND PARKING <br />LOTS <br />Adopted by Roseville Citv Council on xxx <br />Revised on xxxx <br />I. PURPOSE <br />The purpose of this policv is to establish and maintain uniform definitions and procedures concerning snow and <br />ice control operations at the Citv of Roseville. <br />II. GOAL <br />It is the goal of the Citv of Roseville Public Works Department to maintain safe Citv roadways during the snow <br />and ice season in order to ensure delivery of emergency services and to provide access to the motoring public. <br />a. Perform snow removal and ice control tasks in atimely manner and perform all maintenance tasks <br />equally and in the best interest of Roseville taxpavers. <br />b. To have streets and critical parking lots plowed full width within 10 hours after the snow has quit falling <br />for snow events greater than two inches. <br />c. The Citv will provide such control in a safe and cost-effective manner, keeping in mind safety, budget, <br />personnel, and environmental concerns. <br />III. PROCEDURE <br />Responsibility for directing and coordinating snow and ice control operations is assigned to the Street <br />Maintenance Division of the Public Works Department. Snow and ice control w ill4aave-is a top priority in the <br />Public Works Department and is considered an emergencv in nature. The Citv will use in-house public works <br />staff including streets, utility and central garage divisions, and/or private contractors when necessary, to provide <br />this service. <br />a. Dispatching Operations <br />i. The start of snow and ice control operations for any storm is dependent upon immediate and <br />anticipated conditions. The Street Superintendent or his/her designee will determine the dispatching <br />of staff/equipment. Plowing and/or ice control operations may occur during a regular work shift <br />(7:00 a.m. to 3:30 p.m.) or on an emergency call -out basis. <br />b. Streets Maintenance Operations <br />i. Route Prioritization <br />1. The City is divided into various plow routes (Exhibit A). Each route has priority main routes <br />that are cleared first. <br />2. Snow will be plowed in a manner so as to minimize traffic obstructions. The center of the street <br />will be plowed first. The snow will then be pushed from left to right with discharge going onto <br />the boulevard area of the right-of-wav until the street is cleared curb--to--curb. <br />3. In cul-de-sacs, snow is plowed to try and minimize snow windrows in driveways by pushing the <br />majority of the snow onto open areas in the boulevard. <br />ii. Snow Event Type <br />1. Freezing rain, sleet, black ice, and freeze/thaw. These types of events are based on changing <br />weather conditions. The Street Superintendent will determine the required ice control response <br />based on current and forecasted conditions. <br />2. Snowfall of less than 2". General snow plowing may not be necessary and normal ice control <br />procedures may be adequate to produce safe winter driving conditions. The Street <br />Superintendent may deem plowing necessary if a series of less than 2" snowfalls has caused a <br />buildup of snow on c8ity streets. <br />Page 1 of 10 <br />Page 55 of 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.