on hand, but final installation is pending permits and coordination on exact <br />placement. A second phase will begin in the spring. <br />Willow Pond Project <br />The project has been delayed due to the need for an Environmental <br />Assessment Worksheet (EAW). A consultant has been hired, and the <br />Commission may review it around June. Construction could occur in late fall <br />or winter, depending on timing. <br />Keva Park Pathwav <br />City Council directed staff to proceed with a basic pathway installation <br />(Option C), keeping the roadway unchanged. <br />Lighting & Neighborhood Updates <br />Intersection lighting improvements will resume in the spring. In the Owasso <br />Hills neighborhood, residents generally support enhanced lighting. An <br />appraisal is underway, and there may be future discussion of amending the <br />policy depending on the findings. <br />Ramsey County Projects <br />Ramsey County has significant work planned over the next several years: <br />County Road C (2026): Mill and overlay from Lexington Avenue to Little <br />Canada Road; bridge work to follow the next year. <br />Fairview Avenue: Resurfacing from Larpenteur Avenue to County Road B2, <br />including signal work at County Road B and Gluck Lane, plus some roadway <br />redesign. <br />Countv Road D (Design for 2027): Proposed pathway addition on the south <br />side from Cleveland Avenue to Fairview Avenue. <br />Victoria Street (2028 project): Currently in design <br />Rice Street (2028 project): From Wheelock Parkway to County Road B; <br />coordinated with G Line transit improvements. <br />Larpenteur Avenue: Corridor study beginning soon. <br />NMDOT Proiects <br />Snelling Avenue: Mill and overlay beginning around April 15, to be <br />completed before the State Fair; includes west -side pathway from Lydia <br />Avenue to Old Highway 8. <br />Highwav 280: Resurfacing project spanning two years <br />Page 3 of 18 <br />