My WebLink
|
Help
|
About
|
Sign Out
Home
26_0324_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0324_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 9:02:34 AM
Creation date
3/25/2026 8:59:10 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/24/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Preference List <br />Pathway MpM elan <br />=Pmj� <br />Opertption <br />TYPE <br />NOTES <br />Pdontslts <br />and Parka ConatNlatan <br />Plan Rank <br />Pathway <br />Master Plan Searnent on Arterld Roadway with more than 4,000 ADT, with no pathway on either aide of the roadway. <br />Parka and Recreation Master Plan Constellation tlnk <br />29 <br />Commerce Street" <br />Develop a pathway connection between Albert St and Hemline Ave <br />Trail Sidewalk <br />13 <br />27 <br />Develop a constellation link pathway along MInnesop Avenue between Lovell Avenue pathways and <br />G3 <br />Constellation Link F3 <br />Materion Park. <br />13 <br />27 <br />Develop a constellation link pathway along Oakcrest Avenue between Fairview Avenue pathways and <br />CI-2 <br />Constellation Link 11 <br />Constellation <br />Park. <br />13 <br />27 <br />37 <br />Lydia Avenue <br />Develop and offroad pathway onLydia Avenue between Snellin Avenue and Hemline Avenue <br />Trail/Sidewalk <br />13 <br />27 <br />Construct a sidewalk on the north side of County Road C from Western to Rice Street. <br />5 <br />County Road C Sidewalk <br />Sidewalk <br />Not part of2026 project <br />12 <br />31 <br />7 <br />Fairview Avenue C(north of B-2( <br />Development of off -road pathways between County Road C2 and County Road D. <br />Trail/Sidewalk <br />12 <br />31 <br />31 <br />Pascal Street- <br />Develop a pathway connection between County Road and Commerce Street <br />Trail Sidewalk <br />12 <br />31 <br />Develop a constellation link pathway along Arona/Lydia between County Road C2 and Autumn Grove Park. <br />CC-2 <br />Constellation Link C3 <br />12 <br />31 <br />Develop a constellation link pathway along Gelder Street and Matilda Street to connect County Road B2 <br />CF-2 <br />Constellation Link F2 <br />agp s W Acorn Park. <br />12 <br />31 <br />18 <br />Judith to Iona Connectiong <br />Develop a pathway connection between Judith Ave and Iona Lane. <br />Trail/Sidewalk <br />11 <br />36 <br />Develop a mnstellaflon link pathway along M aple Lane between Highcrest Road pathway and Old Hwy B <br />CA-1 <br />Constellation Link Al <br />11 <br />36 <br />Develop a mnstellaflon link pathway along Oakcrest Avenue and Fernwood Street between Hamline <br />CH-1 <br />Constellation Link H3 <br />Avenue pathways and Willow Pond Park pathways. <br />11 <br />36 <br />Develop a mnstellaflon connection between Consellation H and l across Snelling Avenue between County <br />CHI <br />Constellation Connection Htel <br />Road B2 and County Road C. <br />11 <br />36 <br />Develop a mnstellaflon link pathway along William Street between the pathway on N McCarron Boulevard <br />ON-1 <br />Constellation Link N3 <br />and the pathway along County Road B. <br />11 <br />36 <br />1 <br />County Road <br />Develop pathway facilities, both on -and off -road, between Cleveland and Fairview Avenue. <br />Trail/Sidewalk <br />2027 Project <br />10 <br />41 <br />11 <br />Dale Street South <br />The construction ofan off-street pathway from Reservoir Woods Park to Larpenteur Avenue. <br />Trail Sidewalk <br />30 <br />41 <br />19 <br />Lovell to Minnesota Connection <br />Develop a pathway connection between Lovell Ave and Minnesota Street. <br />Trail/Sidewalk <br />10 <br />41 <br />Develop a pathway connection that creates a link between the corner of Millwood and Chatsworth through <br />21 <br />Millwood to County Road C2 Link <br />the Ramsey County open spa a to County Road C2. <br />Trail/Sidewalk <br />10 <br />41 <br />Develop a pathway connection along Alta Vista Drive between Larpenteur Avenue and Reservoir Woods <br />24 <br />Alta Vista Delve <br />Park. <br />Trail/Sidewalk <br />10 <br />41 <br />Develop a pathway connection between County Road B and Commerce Street <br />Partial completed - <br />30 <br />Albert street- <br />Sidewalk <br />Modify <br />10 <br />41 <br />Develop a mnstellaflon link pathway along Aldine St between Oasis Park and Lydia Avenue pathway. <br />CB-2 <br />Constellation Link B2 <br />SO <br />41 <br />Develop a constellation link pathway along Rose Place and Aladdin Street to connect Fisk Street with <br />CG-1 <br />Constellation Link G3 <br />Central Park Dale Street Soccer Fields <br />30 <br />41 <br />Develop a constellation link pathway along Oxford Street between County Road B2 pathways and Central <br />CG-2 <br />Constellation Link G2 <br />Park pathway off Brooks Street. <br />10 <br />41 <br />Develop a constellation link pathway along Pascal Street between County Road B2 pathways to Pocahontas <br />61-2 <br />Constellation Link H2 <br />Park. <br />10 <br />41 <br />Develop a constellation link pathway along Shryer Avenue and the east side of the Her Mar Mall to connect <br />Q-1 <br />Constellation Link L1 <br />the pathway on Hamline to the pathway of County Road B. <br />10 <br />41 <br />Develop a constellation link pathway along Ryan Avenue and Ferrevood Street to connect Bruce Russell <br />Q� <br />Constellation Link L3 <br />Park to Keller M ayflower Park. <br />30 <br />41 <br />Develop a constellation link pathway along Chatsworth Street between Roselawn and Shryer to connect to <br />CM-2 <br />Constellation Link M2 <br />Pioneer Park. <br />30 <br />41 <br />Develop a constellation link pathway along Alameda Street between Resevoir Woods and the pathways on <br />Cases <br />Constellation <br />Constellation Link M4 <br />Road B. <br />30 <br />41 <br />PWET <br />Comments <br />Page 2 of 4 <br />Page 21 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.