My WebLink
|
Help
|
About
|
Sign Out
Home
26_0324_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0324_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 9:02:34 AM
Creation date
3/25/2026 8:59:10 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/24/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Preference List <br />MR <br />E <br />Description <br />TYPE <br />NOTES <br />TotalPathway <br />Points <br />Mah sPlan <br />and Parka Constellation <br />Plan Rank <br />Pethwey <br />Mortar Plan Sepnent on Artarlel Roadway with more than 4,000 ADT, with no pathway on either side of the roadway. <br />Parks and Recreation Matter Plan Constellation link <br />F <br />Minnesota Avenue <br />Sidewalk/Tail from novel to Western <br />Tail/Sidewalk <br />Potential Add <br />c <br />Western Avenue <br />Sidewalk/Trail on east side from Minnesota to Lovell Avenue <br />Tail/sidewalk <br />Potential Add <br />H <br />Minnesota Avenue <br />Sidewalk/Tail from Western to Rice St <br />Tail/Sidewalk <br />Potential Add <br />I <br />Aldine St ROW <br />sidewalk/Tail from Roselawn Ave to Ryan Ave <br />Tail/Sidewalk <br />Potential Add <br />i <br />County Road <br />Sidewalk on the south side of County Road B between Avon St and Dale St <br />sidewalk <br />Potential Add <br />K <br />Terminal Rd <br />Long lake Rd to Cievelend Ave (North Side) Updgade sidewalk to Tail on Bridge <br />Tail <br />Potential Add <br />L <br />Skillman Ave <br />Fairview Ave to Snelling Ave <br />Tail/Sidewalk <br />Potential Add <br />M <br />Central Park <br />Pathway connection west of Virtona St to pathway around frog pond <br />Tail/Sidewalk <br />Potential Add <br />R <br />Rose Place <br />Trail connection between Dunlap St and Roseplace Cul-ch sac <br />Tail/Sidewalk <br />Potential Add <br />0 <br />Judith Ave Extension <br />Connectionfrom6dggsto Veterans Park <br />Tail/Sidewalk <br />Potential Add <br />I P <br />OxfordS[ <br />Connection from Contrail Park acres RR tracks to Cry Rd <br />iSidewalk <br />Potential Add <br />PWET <br />Comments <br />Page 4 of 4 <br />Page 23 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.