My WebLink
|
Help
|
About
|
Sign Out
Home
26_0519_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0519_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:08:58 AM
Creation date
5/20/2026 11:07:48 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/19/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public questions or complaints about 280, including things like increased traffic <br />on Cleveland Avenue or Snelling Avenue, can be shared with Mn DOT at 612-254- <br />7776 or info@hwy280construction.com. <br />o Gateway Bridge Project <br />Interagency meeting kickoff held forthe 2031 project on 135W, TH 36 and 12-14 <br />bridgesfrom Fairview Avenue to the east. <br />• Other <br />o G Line (Metro Transit) <br />Construction 2026-2028, start date TBD. <br />o Private Utilities <br />• Xcel is inspecting and replacing poles around town throughoutthe year. No <br />closures currently anticipated. <br />• Xcel is undergrounding overhead lines in seven small areas in Roseville where <br />damage to lines is reoccurring and problematic. No closures currently <br />anticipated. Currentwork at 266 Grandview Avenue and nextweek at County <br />Road B and Farrington Street. <br />Lumen is placing newfiber in neighborhood of Transit Avenue from Rice Street to <br />Western Avenue. <br />LTS Telecommunications is installing fiber along Woodhill Drive between Oxford <br />Street & Victoria Street. <br />Engineering Updates: <br />• National Public Works week is May 17-23! We are celebratingwith a lunch and hopefully some <br />fun social media posts. <br />• Jennifer Lowry attended the National Association of City Transportation Officials (NACTO) <br />National Conference in Minneapolis May 12-14. <br />• The four engineering interns are scheduled to start May 18. We hope to have them attend a <br />Commission meeting. <br />Environmental & Sustainability Updates: <br />• Climate Equity Action Plan Draft is availablefor reviewonthe Citywebsite thru June 6. <br />htto://www. cityofrosevi Ile. com/4004/Cli mate-Eq uity-Acti on- Plan <br />• DeVonte Roberts isthisyear's Sustainability Intern and has started parttime until going full time <br />this summer. <br />• The second Native Plant Sale with MNLwill open for orders thru May 14, for pickup May 30. Both <br />residents of Roseville and non-residents can place orders at <br />http://www.cityofroseville.com/3979/Roseville-Native-Plant-Sate <br />• The final community outreach event forthe Climate Equity Action Plan was held on Monday, <br />May 4to gatherfeedback on action prioritization. <br />• Staff is hosting an "Eco Art Night" on Wednesday, May20 atthe Harriet Alexander Nature Center <br />from 6:30-8:30 p.m. Free and open to the public. <br />• The annual stormwater update, to fulfill MS4 permit requirements, is scheduled for May 19 <br />during the PWET meeting. <br />• Shredding Day is May 16, 2026, from 9:00 a.m. to noon, held in the parking lot of City Hall (2660 <br />Civic Center Drive, Roseville, MN). Open to Roseville residents only. <br />• WM staff will present their annual report during the May 19 PWETC meeting. Thisisthefirst <br />Commission meetingthat WM has attended. <br />PWET Communications Memo Page 3 <br />Page 5 of 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.