<br />VILLAGE OF ROSEl ILLE
<br />
<br />Regular meeting of the Village Council, Tuesday, October 25, 1960.
<br />
<br />The Village Council met en the above date with the following members
<br />present: Mayor Cedarholm, Carlson, Keene and Shields. Attorney
<br />Loftsgaarden and Engineer Soutter were also present. Flanagan was
<br />absent.
<br />
<br />8:00 P.M.
<br />
<br />Keene Moved, Shields Seconded, that the minutes of the regular meeting MINUTES
<br />;jf October 18, 1960, be approved as submitted. Roll Call, Ayes (4),
<br />Nays (0).
<br />
<br />)J!.r. Warner of the Minnesota Industrial Commission addressed the Council MINN. INDUSTRIAL COMM.
<br />concerning safety operation in sewer connection ditches, and was advised
<br />the proper procedure in filing a complaint.
<br />
<br />Shields Noved, Carlson Seconded, that the Clerk be authorized to open OPENING OF BIDS
<br />bids for phases 3, 4 and 5 of Storm Drainage to Halsh Lake. Roll Call,
<br />Ayes (II) - Nays (0).
<br />
<br /> Phase 3 Phase 5 Phases 3 & 5 Phase 4
<br />Hurley Construction Co. .
<br />403 So. Robert, St. Paul 2,065.00 9,153.00 11,218.00 21,037.50
<br />Start immediately - complete 11/30/60
<br />Phase 4 - complete May 15, 1961
<br />Carl Bolander & Sons 2,45~.OO 6,500.00 8,955.00 16,750.00
<br />2933 Pleasant Ave.So., Mpls.
<br />Start immediately - complete 11/30/60
<br />Phase 4 - complete Hay 15, 1961
<br />Lametti & Sons, Inc. 1,868.50 5,7B6.50 7,655.00 15,875.00
<br />211 No. Pascal, St. Paul
<br />Start immediately - complete as specified
<br />Phase 4 - complete as specified
<br />Barbarossa & Sons, Inc. 1,710.00 5,700.00 7,410.00 -------
<br />402 33rd Ave. No., St. Cloud
<br />Start immediately - complete November 14, 1960
<br />I1innkota. Developers Inc. 1,295.00 3,590.00 5,185.00 17,125.00
<br />6332 Lakeland Ave. No.,Mpls.
<br />Start Nev. 1, complete November 30, 1960
<br />.)hase 4 - complete 11ay 15, 1961
<br />Waldon Excava.ting Inc. 1,800.00 5,525.00 7,325.00 14,875.00
<br />3242 I1ighway 8, Mp1s.
<br />Start ?Jov. 1, Complete December 1, 1960
<br />Phase tt - complete Nay 15, 1961
<br />
<br />Shields f10ved, Carlson Seconded, that the bids be referred to the TABULATION OF BmS
<br />engineer for tabulation. Roll Call, Ayes (4) - Nays (0)
<br />
|