Laserfiche WebLink
<br />VILLAGE OF ROSEl ILLE <br /> <br />Regular meeting of the Village Council, Tuesday, October 25, 1960. <br /> <br />The Village Council met en the above date with the following members <br />present: Mayor Cedarholm, Carlson, Keene and Shields. Attorney <br />Loftsgaarden and Engineer Soutter were also present. Flanagan was <br />absent. <br /> <br />8:00 P.M. <br /> <br />Keene Moved, Shields Seconded, that the minutes of the regular meeting MINUTES <br />;jf October 18, 1960, be approved as submitted. Roll Call, Ayes (4), <br />Nays (0). <br /> <br />)J!.r. Warner of the Minnesota Industrial Commission addressed the Council MINN. INDUSTRIAL COMM. <br />concerning safety operation in sewer connection ditches, and was advised <br />the proper procedure in filing a complaint. <br /> <br />Shields Noved, Carlson Seconded, that the Clerk be authorized to open OPENING OF BIDS <br />bids for phases 3, 4 and 5 of Storm Drainage to Halsh Lake. Roll Call, <br />Ayes (II) - Nays (0). <br /> <br /> Phase 3 Phase 5 Phases 3 & 5 Phase 4 <br />Hurley Construction Co. . <br />403 So. Robert, St. Paul 2,065.00 9,153.00 11,218.00 21,037.50 <br />Start immediately - complete 11/30/60 <br />Phase 4 - complete May 15, 1961 <br />Carl Bolander & Sons 2,45~.OO 6,500.00 8,955.00 16,750.00 <br />2933 Pleasant Ave.So., Mpls. <br />Start immediately - complete 11/30/60 <br />Phase 4 - complete Hay 15, 1961 <br />Lametti & Sons, Inc. 1,868.50 5,7B6.50 7,655.00 15,875.00 <br />211 No. Pascal, St. Paul <br />Start immediately - complete as specified <br />Phase 4 - complete as specified <br />Barbarossa & Sons, Inc. 1,710.00 5,700.00 7,410.00 ------- <br />402 33rd Ave. No., St. Cloud <br />Start immediately - complete November 14, 1960 <br />I1innkota. Developers Inc. 1,295.00 3,590.00 5,185.00 17,125.00 <br />6332 Lakeland Ave. No.,Mpls. <br />Start Nev. 1, complete November 30, 1960 <br />.)hase 4 - complete 11ay 15, 1961 <br />Waldon Excava.ting Inc. 1,800.00 5,525.00 7,325.00 14,875.00 <br />3242 I1ighway 8, Mp1s. <br />Start ?Jov. 1, Complete December 1, 1960 <br />Phase tt - complete Nay 15, 1961 <br /> <br />Shields f10ved, Carlson Seconded, that the bids be referred to the TABULATION OF BmS <br />engineer for tabulation. Roll Call, Ayes (4) - Nays (0) <br />