<br />VILLAGE OF ROSEVILLE
<br />
<br />Regular Meeting of the Village Council, April 23, 19620
<br />
<br />.fie Village Council met on the above date with the following members
<br />present: Mayor McGee, Trustees Flanagan, Goodrich, Kustermann and
<br />Reinecke.
<br />
<br />Flanagan Moved, Kustermann Seconded, that the minutes of the ~1eeting of
<br />April 9, 1962, be accepted as presented 0 Roll Call, Ayes (5) - Nays (0) 0
<br />
<br />Goodrich Moved, Reinecke Seconded, that the bids be opened on the Pascal
<br />Avenue storm sewer projecto Roll Call, Ayes (5) - Nays (0).
<br />
<br />Reinecke Moved, Kustermann Seconded, that the bids be closed. Roll
<br />Call, Ayes (5) - Nays (0).
<br />
<br />Reinecke Moved, Kustermann Seconded, that Resolution No. 551 referring
<br />the bids to the Banister Engineering Company be adopted. Roll Call,
<br />Ayes (5) - Nays (0)0
<br />
<br />Kustermann Moved, Goodrich Seconded, that the bids be opened on MC Cut-
<br />back Asphalt and Liquid Asphalto Roll Call, Ayes (5) - Nays (0).
<br />
<br />Goodrich ~~ved, Reinecke Seconded, that the bids be closed. Roll Call,
<br />Ayes (5) - Nays (0)0
<br />
<br />Reinecke Moved, Goodrich Seconded, that the ~lC Cut-back Asphalt and Liquid
<br />Asphalt bid be referred to the Engineer for tabulation and report by the
<br />j of the meeting, Roll Call, Ayes (5) - Nays (0)0
<br />
<br />Reinecke Moved, Goodrich Seconded, that the Village Attorney prepare
<br />an ordinance for rezoning of property owned by the Tusler Lodge #263
<br />located between Hamline and Dellwood just north of Snelling Avenue
<br />from R-I to R-3; and that the Attorney also prepare a formal special
<br />use permit allowing a lodge building to be builtin an R-3 zone before
<br />the next Council meetingo Roll Call, Ayes (5) - Nays (0)0
<br />
<br />Goodrich Moved, Kustermann Seconded, that the application for the sign
<br />variance for the Target Store's sign be deniedo Roll Call, Ayes (5) -
<br />Nays (0)0
<br />
<br />Flanagan Moved, Goodrich Seconded, that the public hearing on the
<br />Berntson rezoning be continued for three weeks until May 14, 19620 Roll
<br />Call, Ayes (5) - Nays (0)0
<br />
<br />Flanagan Moved, Kustermann Seconded, that the public hearing on Bartusch,
<br />Kroening, /1cCu lloch, Heaton, Batfie ld and Baker variances be set for
<br />May 14, 19620 Roll Call, Ayes (5) - Nays (0).
<br />
<br />8:00 P.M.
<br />
<br />mNUTES
<br />
<br />PASCAL AVENUE
<br />STORM SEWER
<br />PROJECT
<br />
<br />RESOLUTION NO, 551
<br />PASCAL AVENUE STORM
<br />SEWER IMPROVEMENT
<br />
<br />BIDS ON ASPHALT
<br />
<br />TUSLER LODGE
<br />REZONING
<br />
<br />TARGET STORE'S
<br />VARIANCE
<br />
<br />BE~~TSON REZONING
<br />
<br />VARIANCES
<br />BARTUSCH, KROENING,
<br />MCCULLOCH, HEATON,
<br />HATFIELD AND BAKER
<br />
|