<br />..2-
<br />
<br />Goodrich Moved, Curley Seconded, that Roseville's participation
<br />in a study of St. Paul sewer rates by Greely and Hansen, Engineers,
<br />Chicago, Illinois, to the extent 37% of the total cost (total not
<br />to exceed $15,000) be approved; and that the Village Administrator,
<br />Village Attorney, and Consulting Engineer be authorized to draft
<br />up the necessary contract with Greeley and Hansen, Engineers; and
<br />further that the Administrator, Attorney and Consulting Engineer be
<br />authorized to contact St. Anthony, Shoreview, and Arden Hills for
<br />possible participation in Roseville's share of the cost of the
<br />study. Roll Call, Ayes (5) . Nays (0).
<br />
<br />Goodrich Moved, Grauel Seconded, that the Village Administrator
<br />be authorized to publish pamphlet on Water Improvement 64.4.
<br />Roll Call, Ayes (5) - Nays (0).
<br />
<br />Goodrich Moved, Grauel Seconded, that the personnel changes as
<br />requested by the Village Administrator in his letter of February
<br />l4, 1964, be approved. Roll Call, Ayes (5) - Nays (0).
<br />
<br />Curley Moved, Goodrich Seconded, that the firm of Nason, Law,
<br />Wehrman and Knight be employed to study the Central Park and that
<br />the Village also utilize this firm's services for other Roseville
<br />park planning. Roll Call, Ayes (5) - Nays (0).
<br />
<br />Goodrich Moved, Grauel Seconded, that letter received from
<br />James E. Finley, dated February 17, 1964, regarding Roseville
<br />Water Company, Inc. be placed on file. Roll Call, Ayes (5) -
<br />Nays (0).
<br />
<br />Curley Moved, Goodrich Seconded, that the Village Administrator
<br />be authorized to advertise for bids on voting machines with bids
<br />to be opened by the Administrator and Administrative Assistant at
<br />11:30 A.M., Monday, March 9, 1964. Roll Call, Ayes (5) .. Nays (0).
<br />
<br />Curley Moved, Shields Seconded, that Contractor's Estimate NO.7,
<br />Project No.7, Water Improvement No. 62-1 be paid in an amount of
<br />$68,656.19 to Austin p. Keller Construction Company. Roll Call,
<br />Ayes (5) - Nays (0).
<br />
<br />Curley Moved, Shields Seconded, that Contractor's Estimate No, 9,
<br />Project No, 6, Water Improvement No. 62-1 be paid in an amount of
<br />$48,842.08 to Robert W, Moore Company. Roll Call, Ayes (5) -
<br />Nays (0).
<br />
<br />Grauel Moved, Shields Seconded, that the Village Clerk issue a draft
<br />to the Gluek Brewing Company, a Minnesota Corporation, in an amount
<br />of $26,000 in payment of condemnation of Park Site 36A~lB and
<br />36A-2B. Roll Call, Ayes (5) - Nays (0).
<br />
<br />Curley Moved, Shields Seconded, that the meeting be adjourned at
<br />8:26 P.M. Roll Call, Ayes (5) - Nays (0),
<br />
<br />SEWER RATE
<br />STUDY
<br />
<br />WATER HfPROVE-
<br />MENT 64.4
<br />
<br />PERSONNEL
<br />CHANGES
<br />
<br />CENTRAL PARK
<br />
<br />ROSEVILLE
<br />WATER
<br />COMPANY
<br />
<br />VOTING
<br />MACHINES
<br />
<br />ESTIMATE
<br />NO.7
<br />
<br />ESTIMATE
<br />NO. 9
<br />
<br />PARK SITES
<br />36A-lB AND
<br />36A-2B
<br />
<br />ADJOURNMENT
<br />
<br />ATrnST:#I.~
<br />
<br />~-
<br />~. I,/~ ~
<br />-"[;V(~l,{f ';.
<br />ayor
<br />
|