My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_1964_0803
Roseville
>
City Council
>
City Council Meeting Minutes
>
196x
>
1964
>
CC_Minutes_1964_0803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 8:50:08 AM
Creation date
2/1/2005 10:27:57 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
8/3/1964
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VILLAGE OF ROSEVILLE <br /> <br />11:30 A.M. <br /> <br />Special Meeting of the Village Council, August 3, 1964. <br /> <br />The Village Council met on the above date with the following <br />members present: Mayor Cedarholm, Trustees Curley, Goodrich <br />and Shields. Absent: Trustee Grauel. <br /> <br />Curley Movedo Shields Seconded, that bids on Water Improvement <br />No. 64=6 be opened. Roll Call, Ayes (4) - Nays (0). <br /> <br />WATER IMPROVEMENT <br />NO. 64-6 - BIDS <br /> <br />Shields Moved, Curley Seconded, that the bids on Water Improve- <br />ment No. 64=6 be closed and referred to the Banister Engineering <br />Company for tabulation. Roll Call, Ayes (4) - Nays (0). <br /> <br />Bidder <br /> <br />Robert W. Moore Company <br />Northdale Construction Company <br />McDonald=Luben & Associates <br />Lametti & Sonso Inc. <br />James D. Wolfe Company <br />Peter Lametti Construction Co. <br />Bianconi Construction Company <br />Trap and Berzinski, Inc. <br />Orfei & Sons, Inc. <br />Austin P. Keller Construction Co. <br />Barbarossa & Sons, Inc. <br />Phelps Drake CO.o Inc. <br />F. Morettini Construction Co. <br /> <br />Amount <br /> <br />$31,050.00 <br />31,469.00 <br />33,817.50 <br />34,336.00 <br />35,738.49 <br />35,883.80 <br />38,032.78 <br />38,240.00 <br />33,322.50 <br />37,812.50 <br />36,360.15 <br />35,588.30 <br />35,136.00 <br /> <br />Shields Movedo Goodrich Seconded, that bids on Sanitary Sewer <br />Improvement No.5 be opened. Roll Call, Ayes (4) = Nays (0). <br /> <br />SANITARY SEWER <br />IMPROVEMENT <br />NO. 5 = BIDS <br /> <br />Shields Moved, Goodrich Seconded, that the bids on Sanitary <br />Sewer Improvement No. 5 be closed and referred to the Banister <br />Engineering Company for tabulation. Roll Call, Ayes (4) - <br />Nays (0). <br /> <br />Bidder <br /> <br />Lametti & Sons, Inc. <br />McDonald Luben & Associates <br />F. Morettini Construction Co. <br />Trap & Berzinski, Inc. <br />Phelps-Drake Company, Inc. <br />Robert W. Moore Company <br />Austin P. Keller Construction Co. <br />Northdale Construction Company <br />Orfei & Sons 9 Inc. <br />Barbarossa & Sons, Inc. <br />Peter Larnetti Construction Co. <br /> <br />Amount <br /> <br />$86,457.00 <br />92,567.85 <br />93,980.00 <br />96,922.50 <br />97,356.35 <br />101,813.20 <br />103,279.00 <br />105,947.00 <br />107,073.65 <br />113,250.07 <br />118,073.95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.