Laserfiche WebLink
<br />-10- <br /> <br />James Kellet <br />Kroiss Construction Co. <br />John Logerquist <br />Alvin Lust <br />C. Schirmers <br />Vernon Theisen <br />John Traeger <br />Charles Tutton <br />Michae 1 Hodges <br />D. Updyke <br />J. Bods gard <br />Cogburn Sales Co. <br />Bote 1 Lowry <br />Ruffridge-Johnson Equipment Co. <br />State of Minnesota <br />Tri State Drilling <br />University of Minnesota <br />Western Union <br />Zeco Company <br /> <br />50.00 <br />47.92 <br />39 . 49 <br />32.18 <br />25 . 81 <br />39 . 5 3 <br />33. 83 <br />3S. 26 <br />19.00 <br />13.00 <br />15.50 <br />7.67 <br />55.62 <br />19.60 <br />15.00 <br />233.69 <br />1,150.00 <br />1.29 <br />9.50 <br /> <br />Curley Moved, Linebarger Seconded, that the Mayor and ~4anager be <br />authorized to sign a quit claim deed for the property described <br />in the easement for Terrace Drive, upon the owners of the fee <br />interest tendering to the Village an easement for the road as <br />actually constructed. Roll Call, Ayes: Linebarger, Shields, <br />Curley and Grauel. Nays: None. <br /> <br />TERRACE DRIVE <br /> <br />Shields Moved, Curley Seconded, that the following bills be paid <br />the Banister Engineering Company: <br /> <br />BANNISTER <br />ENGINEERING <br />COMPANY <br /> <br />For: <br /> <br />Storm Sewer Improvement 67-10 $ <br />Storm Sewer Improvement 67-20 <br />Storm Sewer Improvement 67-9 <br />Storm Sewer Improvement 65-38A <br /> <br />5,664.55 <br />4, 145 . 45 <br />3,771. 43 <br />1,899.00 <br /> <br />Roll Call, Ayes: Linebarger, Shields, Curley and Grauel. <br />Nays: None. <br /> <br />Curley Moved, Shields Seconded, that the request of John and Paul <br />Schwalbach for variance to sign ordinance in front yard setback at <br />2633 North Rice Street be referred to the Planning Commission. <br />Roll Call, Ayes: Linebarger, Shields, Curley and Grauel. Nays: <br />None. <br /> <br />PLANNING <br />COMMISSION <br /> <br />Curley Moved, Shields Seconded, that Estimate No. 5 on Storm <br />Sewer Improvement 67-9 be paid Austin P. Keller Construction Co. <br />in the amount of $35,247.58. Roll Call, Ayes: Linebarger, Shields, <br />Cur ley and Graue 1. Nays: None. <br /> <br />IMPROVEMENT <br />NO. 67-9 <br /> <br />Shields 1'40ved, Curley Seconded, that Estimate No. I on Project <br />68-10 be paid Austin p. Keller Constrl.1ction Company in the amount <br />of $S,074.67. Roll Call, Ayes: Linebarger, Shields, Curley and <br />Grauel. Nays: None. <br /> <br />IMPROVEMENT <br />NO. 68-10 <br /> <br />Shields Moved, Linebarger Seconded, that Change Order No.2, <br />Improvement 67-20 be approved and the Hayor and Manager authorized <br />to sign it. Roll Call, Ayes: Linebarger, Shields, Curley and <br />Grauel. Nays: None. <br /> <br />IMPROVEMENT <br />NO. 67-20 <br />