Laserfiche WebLink
<br />Power supply units according to item (b) of <br />the Fee Schedule. A like fee will be required on power <br />supply units at each engagement during the season, <br />except that a fee of $12.00 per hour will be charged <br />for additional time spent by the inspector, if the <br />power supply is not ready for inspection at the time and <br />date specified on the request for inspection as required <br />by law. <br /> <br />Rides, Devices or Concessions: Shall be inspected <br />at their first appearance of the season and the <br />inspection fee shall be $6.00 per unit. <br /> <br />IV. <br /> <br />This Ordinance shall take effect and be in <br /> <br />force from and after its passage and publication. <br /> <br />PASSED by the City Council of the City of <br /> <br />Roseville, Minnesota, this 4th <br /> <br />day of r:ecenber <br /> <br />I 1978. <br /> <br />~~ <br /> <br />ATTEST: <br /> <br />( ) / <br />I / .-' <br /> <br />i\X:.~;;~-~~~-?( <frcA~ <br /> <br />(,/. <br />