Laserfiche WebLink
<br />o to 100 am pere capacity - $13.00 <br />101 to 200 ampere capacity - $16.00 <br />For each additional 100 ampere capacity or fraction thereof - <br />$7.00 <br /> <br />(c) Circuit, installations of, additions, alterations or repairs <br />of each circuit or sub-feeder shall be computed separately including <br />circuits fed from sub-feeders and including the equipment served, <br />except as provided for in items (d) through 0). <br /> <br />o to and including 30 ampere capacity - $3.25 <br />(maximum number of 0 to 30 ampere circuits to be paid on is 30 <br />in anyone cabinet). <br />31 to and including 100 ampere capacity - $5.00 <br />For each additional 100 ampere capacity or fraction thereof - <br />$2.50. <br /> <br />(d) Maximum fee on a single family dwelling shall not exceed <br />$50.00 if not over 200 ampere capacity. This includes service, <br />feeders, circuits, fixtures and equipment. <br /> <br />The maximum provides for no more than two rough-in inspec- <br />tions and the final inspection per dwelling. Additional inspections at <br />the reinspection rate. <br /> <br />(e) Maximum fee on an appartment building shall not exceed <br />$25.00 per dweUing unit for the first 20 units and $20.00 per dwelling <br />unit for the balance of the units. A two-unit dwelling (duplex) <br />maximum fee per unit as per single family dwelling. <br /> <br />(f) The maximum number of 0 to 30 ampere circuits to be <br />paid on anyone Athletic Field lighting standing is 10. <br /> <br />(g) In addition to the above fees: <br /> <br />(1) A charge of $2.00 will be made for each street <br />lighting standard. <br /> <br />(2) A charge of $2.00 will be made for each traffic <br />signal standard. Circuits originating within the standard will <br />not be used when computing fees. <br /> <br />(h) In addition to the above fees all transformers and <br />generators for light, heat and power shall be computed separately at <br />$4.00 per unit plus 20<; per KVA up to an including 100 KVA, 101 KVA <br />and over at 15<; per K VA. The maxim um fee for any transformer or <br />generator in this category is $40.00. <br /> <br />(i) In addition to the above fees, all transformers for signs <br />and outline lighting shall be computed at $3.00 for the first 500 V A or <br />fraction thereof per unit; plus 30e for each additional 100 VA or <br />fraction thereof. <br />