My WebLink
|
Help
|
About
|
Sign Out
Home
ord_873
Roseville
>
City Council
>
City Council Ordinances
>
0800
>
ord_873
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:04:41 AM
Creation date
4/22/2005 12:59:54 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Ordinance #
873
Ordinance Title
An ordinance amending Sections 30.090, 32.010, 32.050, 32.060, 32.070, 32.080, 32.101, 32.110, 32.170, 32.180, 32.185, 32.190, 32.250, 32.290 and 32.300 of the city code of the City of Roseville providing for new permit rates.
Ordinance Date Passed
12/22/1980
Ordinance Date Published
1/7/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o to 100 am pere capacity - $13.00 <br />101 to 200 ampere capacity - $16.00 <br />For each additional 100 ampere capacity or fraction thereof - <br />$7.00 <br /> <br />(c) Circuit, installations of, additions, alterations or repairs <br />of each circuit or sub-feeder shall be computed separately including <br />circuits fed from sub-feeders and including the equipment served, <br />except as provided for in items (d) through 0). <br /> <br />o to and including 30 ampere capacity - $3.25 <br />(maximum number of 0 to 30 ampere circuits to be paid on is 30 <br />in anyone cabinet). <br />31 to and including 100 ampere capacity - $5.00 <br />For each additional 100 ampere capacity or fraction thereof - <br />$2.50. <br /> <br />(d) Maximum fee on a single family dwelling shall not exceed <br />$50.00 if not over 200 ampere capacity. This includes service, <br />feeders, circuits, fixtures and equipment. <br /> <br />The maximum provides for no more than two rough-in inspec- <br />tions and the final inspection per dwelling. Additional inspections at <br />the reinspection rate. <br /> <br />(e) Maximum fee on an appartment building shall not exceed <br />$25.00 per dweUing unit for the first 20 units and $20.00 per dwelling <br />unit for the balance of the units. A two-unit dwelling (duplex) <br />maximum fee per unit as per single family dwelling. <br /> <br />(f) The maximum number of 0 to 30 ampere circuits to be <br />paid on anyone Athletic Field lighting standing is 10. <br /> <br />(g) In addition to the above fees: <br /> <br />(1) A charge of $2.00 will be made for each street <br />lighting standard. <br /> <br />(2) A charge of $2.00 will be made for each traffic <br />signal standard. Circuits originating within the standard will <br />not be used when computing fees. <br /> <br />(h) In addition to the above fees all transformers and <br />generators for light, heat and power shall be computed separately at <br />$4.00 per unit plus 20<; per KVA up to an including 100 KVA, 101 KVA <br />and over at 15<; per K VA. The maxim um fee for any transformer or <br />generator in this category is $40.00. <br /> <br />(i) In addition to the above fees, all transformers for signs <br />and outline lighting shall be computed at $3.00 for the first 500 V A or <br />fraction thereof per unit; plus 30e for each additional 100 VA or <br />fraction thereof. <br />
The URL can be used to link to this page
Your browser does not support the video tag.