My WebLink
|
Help
|
About
|
Sign Out
Home
pm_710707
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
197x
>
1971
>
pm_710707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:31:48 PM
Creation date
12/15/2004 7:13:00 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
7/7/1971
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roseville PImming Commissia:'1 Heating <br />iledncsday, July 'J, 1971 <br /> <br />The July 7, 1911, meetiuR of tba Roseville Plann:1Jlg Commission ~,yas called to order <br />by Chainnan Membrez at 7: 35 P ~l'1. <br /> <br />i'>iembers present: <br />Members absent: <br />Others present: <br /> <br />Edlwd, Eagles, Demos and '.fenbrez. Kellett arrived at 7:45 PoHo <br />Johnson and Pope <br />Cot.J1cilman Gale Linebarger, Publ ic \'lorks Director Sherman r101dbeT~.~ D <br />Midwest PImming repl'esentative Dick ThTinell and Administrathre <br />Assistant Steve North <br /> <br />Mr. Edlund moved and Mr" Eagles seconded, that the minutes of the neeting of <br />June 2g 1911, be approved. Roll Call, Ayes: EdlundD Ea.gles, Demos and Hembrez, <br />Nays: None" <br /> <br />~1IDiP...-..&- File 629~2! ~ Zimmerman Realty request for rezoning from R~l to BIB, <br />special use permit, ~nd variances to height limitatim <br />and setback at 2350 North Snelling Avenue <br /> <br />Presen ta tioo.: <br /> <br />Mro Tom Van Housen, representing ZiInJre'IJTiaD. Realty ~ made a slideonarrative pre 5 I3nt, <br />ation~ He indicated that the li'dvelopment would be a twin to\reT rotel<>office complex <br />including speciality shops, convention facilities and a restnUraIlto TIieTe \-Jould be <br />one 12 story building and a six story building. The total land area inwl ved includ~ <br />ing Zimmerman Lake and the flowage easements would be 17.28 acres. The current zonil:;. <br />of the property is R=l sinJ!le family. The Comprehensive Plan SllCMS the property for <br />potential use as R"'3A. multiple family" The requested zoning is for BIB ''lith special <br />use permit for 200 unit motel plus a 12 stoty height variance. The building covers <br />1502% of the total site. The circulation area including pa.rking, driveways and side <br />walks covers 1804% of the site, and the open space encompasses 66.4% of the siteo <br />The development provides for 240 parking spaces located underground. Access and eg:re:2 <br />are provided on County Road 3=2. The property is served by an eight inch \'satenna.iu <br />and an eight inch sanitary se\ller. <br /> <br />t-.lro Van Housen indicated that Zimmerman Realty has asked the Highway Departw.ant ,1nd <br />the Village for the ye<JconveY311ce of the flowage easerent set at elevation 930 u:-;et <br />since Coun.ty Road B~2 is set at elevation 928 feet and the ne\'i storm drainage outlet <br />is set at elevation 923 feetG Zimmerman is requestlllg that the new flowage easement <br />be established at elevation 924 feet r or less.. TIlis request is currently pending ~1id <br />the State of l>1innesota. The estimated construction cost for the entire development <br />is $S c. $7 million dollars. It is anticipated that the 200 unit 12 story motel~offic~ <br />buildin,g will be the first phase of the developm..<>nt l'iith its construction to begin <br />within 12 months aft<3r the rezoning is granted~ The second phase of the development;: <br />including the six story motel=office conplex will be completed depending upon. leaS:lnf <br />arrangements and the demand for space. Total construction time for the entire dewIer <br />rent is estimated to be from 2~1/2 to 3 year3.. <br /> <br />Discussion <br />v ______ <br /> <br />~4r.. M9Jd'):~'I')z inquired if the developer cG1sidered one access to be sufficient" <br />Mro r-embrez felt that with the variety of business' involved in the complex that <br />there w.?U1d be sufficient traffic to waITant mte entrances and exitso <br />
The URL can be used to link to this page
Your browser does not support the video tag.