My WebLink
|
Help
|
About
|
Sign Out
Home
pm_950510
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
199x
>
1995
>
pm_950510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:34:29 PM
Creation date
12/15/2004 7:56:00 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
5/10/1995
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Allen case until the June 14, 1995, meeting or request the applicant to withdraw. <br /> <br />Roll Call: <br /> <br />Ayes: <br />Nays: <br /> <br />Wall, Sandstrom, Harms, Thomas, Wietecki <br />None <br /> <br />The staff was directed to review the addresses of property owners in the area who should <br />receive notices of continuances and future public hearings. <br /> <br />6. <br /> <br />(b) <br /> <br />Plannin~ File 2741: A. H. LienINorth Heights Lutheran Church request for a <br />special use permit to allow temporary modular office space at 2701 Rice Street. <br /> <br />Chairman Keith Wietecki opened the public hearing and requested City Planner Michael <br />Falk to provide a background report. Falk eXplained the property is zoned R1 single <br />family and is designated for both school and church on the city's Comprehensive Land <br />Use Guide Plan. North Heights Lutheran Church proposes to construct 2 temporary 24' X <br />70' modular office spaces on the school site, and to request an interim use permit to allow <br />them to remain for 3 years. The staff recommended approval subject to final drainage <br />plans and fire marshall review of the building separation issues. <br /> <br />Member Thomas asked for information regarding the type of building and whether the <br />intent was to move more quickly than expected, so that the temporary buildings may be <br />removed prior to the 3 year limit. <br /> <br />Chairman Wietecki asked if there was a possibility that the buildings may be on the site <br />for more than 3 years. (It may be necessary.) Chairman Wietecki noted that he wanted <br />the buildings to be as close to city standards and as compatible as possible with the <br />existing buildings and the neighborhood, and would ask the staff to look at the exterior <br />design issues. There was no comment from the public. <br /> <br />Chairman Wietecki closed the public hearing. <br /> <br />MOTION: Member Thomas moved, seconded by Member Wietecki, to recommend <br />approval of a 3-year (through September of 1998 or shorter time) interim use permit for <br />North Heights Lutheran Church for the use of2 24' x 70' temporary buildings for office <br />space. This interim use permit is contingent on staff review of the exterior structure and <br />design being more compatible with the use of gabled roofs, coloring, wood steps; and on <br />the city's approval of drainage and building setback plans prior to the building permit <br />approval. <br /> <br />Roll Call: <br /> <br />Ayes: <br />Nays: <br /> <br />Wall, Sandstrom, Harms, Thomas, Wietecki <br />None <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.