My WebLink
|
Help
|
About
|
Sign Out
Home
2003-03-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2003
>
2003-03-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:00:03 PM
Creation date
6/16/2005 1:48:18 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/27/2003
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. Illicit discharge detection and elimination <br /> <br />Schwartz Duane <br /> <br />Public Works <br /> <br />"'ontaet Last Name <br /> <br />First Name <br /> <br />Department <br /> <br />L660 Civic Center Drive <br /> <br />Mailing Address <br />Rosevill e <br /> <br />MN 55113 <br /> <br />City <br />651-490-2220 <br /> <br />State Zip Code <br />duane.schwartz@ci.roseville.mn.us <br /> <br />E~Mail Address <br /> <br />Telephone (include area code) <br /> <br />a) Have Best Management Practices (BMPs) that will be implemented for this minimum [8JVes DNa <br />control measure been planned or developed? <br />b) Have measurable goals for each BMP for this minimum control measure been planned or [8JVes DNa <br />developed? <br />c) Has an estimated timeline for implementing each BMP for this minimum control [8JVes DNa <br />measure been planned or developed? Timelines should include, in narrative or numerical <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />d) Have the educational components for this minimum control measure been planned or [8JVes DNa <br />developed? <br />e) Provide a brief description of the plan to complete any requirements marked "No" above. <br /> <br />4. Construction site storm water runoff control measures <br />Schwartz Duane <br /> <br />Public Works <br /> <br />,ontact Last Name <br /> <br />First Name <br /> <br />Department <br /> <br />2660 Civic Center Drive <br /> <br />Mailing Address <br />Roseville <br /> <br />MN 55113 <br /> <br />City <br />651-490-2220 <br /> <br />State Zip Code <br />duane.schwartz@ci.roseville.mn.us <br /> <br />E-Mail Address <br /> <br />Telephone (include area code) <br /> <br />a) Have Best Management Practices (BMPs) that will be implemented for this minimum [8JVes DNa <br />control measure been planned or developed? <br />b) Have measurable goals for each BMP for this minimum control measure been planned or [8JVes DNa <br />developed? <br />c) Has an estimated timeline for implementing each BMP for this minimum control [8JVes DNa <br />measure been planned or developed? Timelines should include, in narrative or numerical <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />d) Have the educational components for this minimum control measure been planned or [8JVes DNa <br />developed? <br />e) Provide a brief description of the plan to complete any requirements marked "No" above. <br /> <br />5. Post-construction storm water management measures <br />'chwartz Duane <br /> <br />Public Works <br /> <br />Contact Last Name <br /> <br />First Name <br /> <br />Department <br /> <br />2330 Civic Center Drive <br /> <br />MPCA MS4 Storm Water Permit Application <br /> <br />30f8 <br /> <br />02/06/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.