My WebLink
|
Help
|
About
|
Sign Out
Home
2003-08-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2003
>
2003-08-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:01:33 PM
Creation date
6/16/2005 2:37:50 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/28/2003
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roseville Special Service Test District <br /> <br />South of County Road C <br />North of TH 36 <br />East of Cleveland Avenue <br />West of Fairview <br /> <br />Total frontage feet for district: <br />Total road length for district: <br /> <br />21,221 <br />14,612 <br /> <br />Assessed Amount per Frontage Foot <br /> <br />W/O Energy/Maint. Cost Included <br />600' intervals 150' intervals <br />8,8 35.2 <br />2,77 2.77 <br />24 97 <br />S5746.40 S5746.40 <br />S139,943.99 S559,775.98 <br />21 221 21 221 <br />S6.59 S26.38 <br /> <br />25 yr Energy & Mainl. Cost Included <br />600' intervals 150' intervals <br />8.8 35.2 <br />2.77 2.77 <br />24 97 <br />S10746.63 S10746.63 <br />S261,716.17 S1,046,864.66 <br />21 221 21 221 <br />S12.33 S49.33 <br /> <br />Lightsfmile <br />Road length (miles) <br />Total # lights <br />CosVlighl <br />T atal Project Cost <br />Total Frontage Feet <br />Assessment per foot <br /> <br />Cost of 1 new light with 250 watt High Pressure Sodium shoebox lights on 30' base mounted aluminum poles: <br /> <br />Energy & Maintenance CosUlight <br />Installation cosVlight <br />Engineering, Legal & Administrative Cost (10%) <br />Total cosVlight <br /> <br />W/O Enerav/Maint. Cost <br />SO.OO <br />S5,224.00 <br />S522.40 <br />S5,746.40 <br /> <br />25 vr Enemy & Mainl. Cost <br />$4,545.66 <br />S5,224.00 <br />S976.97 <br />S10,746.63 <br /> <br />Fee for Energy & Maintenance (per quarter) <br />(if billed for service district(per frontage foot) <br /> <br />600' intervals <br />SO.03 <br /> <br />150' intervals <br />SO.12 <br /> <br />. Street tight cost basetj on Oakcresl Project estimates, option 4 <br />.. Figures do not take into account the cost of removal and disposal of existing lighls or cost benefits 01 using existing light poles <br />... Energy & Maintenance Costllighl is estimating cost lor 25 years assuming 45% inflationlyear <br />
The URL can be used to link to this page
Your browser does not support the video tag.