Laserfiche WebLink
<br /> <br />x. <br />fl <br /> <br />03 02:35p <br /> <br />Cit~ of Falcon Heights <br /> <br />6516448675 <br /> <br />p.2 <br /> <br />~ <br />/- 01.1(00 Ue7Jh+S' <br /> <br />THE SIDE LOT DIMENSION. WHEN THE STREET IMPROVEMENT <br />IS ONLY ALONG THE LONG SIDE OF THE LOT, THE SHORT SIDE <br />OF THE LOT WILL BE USED FOR DETERMINATION OF <br />ASSESSABLE FRONT FOOTAGE THE ASSESSMENT FOR THE <br />SHORT SIDE WILL OCCUR WITH THE FIRST STREET TO BE <br />RECONSTRUCTED. <br /> <br />FOR ALL OTHER IMPROVEMENTS SUCH AS SANITARY SEWER OR WATER <br />THE FRONT FOOTAGE SHALL BE THE FOOTAGE ESTABLISHED FOR mE <br />SHORT SIDE OF THE LOT WHEN BOTH SIDES OF THE LOT ARE BEING <br />AFFECTED BY THE IMPROVEMENT. WHERE THE PROPOSED IMPROVEMENT <br />PROJECT IS ONLY ALONG mE LONG SIDE OF A CORNER LOT, THE SHORT <br />SIDE FRONT FOOTAGE SHALL BE USED FOR ASSESSMENT PURPOSES. <br /> <br />B GENERAL <br /> <br />L <br /> <br />PETITION <br /> <br />PETITION SHALL MEAN A WRITTEN DOCUMENT PRESENTED TO mE <br />CITY COUNCIL FOR PURPOSES OF !NITIATING A PUBLIC <br />IMPROVEMENT PROJECT ALL SIGNATURES SHAll BE ACCOMPANIED <br />BY THE ADDRESS OF EACH SIGNATOR mE DATE OF THE SIGNATURE <br />AND A PRINTING OF EACH SIGNA TOR'S NAME. AN EXAMPLE OF THE <br />USUAL FORM OF PETITION IS INCLUDED IN THE APPENDIX. <br /> <br />2. <br /> <br />TOTAL PROJECT COST <br /> <br />TOTAL PROjECf COST SHALL MEAN THE FINAL CONSTRUCfION <br />COST PLUS ALL ASSOCIATED OVERHEAD COSTS. OVERHEAD COSTS <br />SHAll INCLUDE BUT NOT BE LIMITED TO CITY ADMINISTRATION, <br />ENGINEERING, LEGAL, FISCAL, INTEREST DURING CONSTRUCTION, <br />AND LAND ACQUISITION <br /> <br />3. ASSESSMENT PERIOD <br /> <br />mE LENGTH OF PAYMENT PERIOD ON VARIOUS TYPES OF <br />IMPROVEMENT PROjECfS SHALL BE AS FOLLOWS: <br /> <br />SANITARY SEWER <br />W A TERNIAIN <br />STORM SEWER <br />STREET CONSTRUCfION <br />STREET RESURFACING <br /> <br />10-15 YEARS <br />10-15 YEARS <br />5-10 YEARS <br />10-15 YEARS <br />3-7 YEARS <br /> <br />IN THE CASE WHERE SEVERAL OF mE IMPROVEMENTS LISTED ABOVE <br />ARE INCLUDED IN mE SANIE PROjECf, mE ASSESSMENT PERIOD WILL, <br />BE 10-15 YFARS. IN NO EVENT SHALL AN ASSESSMENT PERIOD EXCEED <br />15 YEARS. <br /> <br />ASSMNTMAN <br /> <br />4 <br />